Last Updated | 08/24/2023 02:09 PM |
Project Title | Ott/Story/Cordova Groundwater Treatment System Tank Coating and Equipment Replacement Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Muskegon, MI 49445 (Muskegon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,559,202 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DESCRIPTION OF WORK: 1. Mobilization and General Conditions. 2. Tank preparation and confined space entry setup for each type of tank. 3. Removal of remaining sludge and solids in treatment tanks. 4. Power washing of floor, walls, and equipment in treatment tanks. 5. Hauling and disposal of residual wastewater and sludge solids from tanks. 6. Tank equipment demolition. 7. Interior tank wall preparation and coating installation. 8. Tank equipment furnishing and installation. 9. Equipment start-up. 10. Demobilization and site restoration Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to David L. Conklin at dconklin@fishbeck.com no later than 2:00 p.m., Eastern on July 19, 2023 The Work, Ott Story -In-tank coating and equipment replacement , Agency No. 761 EGLE, File No. 761/10345.SAR includes, but is not necessarily limited to The following: Mobilization and General Conditions. Tank preparation and confined space entry setup for each type of tank. Removal of remaining sludge and solids in treatment tanks. Power washing of floor, walls and equipment in treatment tanks. Hauling and disposal of residual wastewater and sludge solids from tanks. Tank equipment demolition. Interior tank wall preparation and coating installation. Tank equipment furnishing and installation. Equipment start-up. Demobilization and site restoration. The site is located at the Ott Story facility on 453 Agard Road, Muskegon,,MI, as shown on the Drawings |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |