Last Updated | 02/21/2023 03:25 PM |
Project Title | Linn Grove Dam and Park Restoration |
Physical Address | View project details and contacts |
City, State (County) | Linn Grove, IA 51033 (Buena Vista County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected March 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $8,000,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All Bids Rejected By Owner Site Directions: 1) From the South: US 71 to 440th Street (CR13), west to Weaver Street (M36), north to the Little Sioux River (City of Linn Grove). 2) From the North: US -71 to 500th Street (IA-10), west to Weaver Street (M-36), south to the Little Sioux River (City of Linn Grove). Bidding Documents may be downloaded free of charge from the designated electronically . Prospective Bidders are urged to register with the designated electronically a plan holder. The designated electronically will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated electronically. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated electronically.Parks, Recreation, Trail Work, Tree Cutting, Demolition/Building Removal/Hauling/Salvage, Fittings and Valves, Underwater Construction/Repair/Maintenance, Erosion Control/Slope, Bank Stabilization, Fire Hydrant, Steel Sheet Pile Wall, Landscaping, Excavation, Water Diversion Structure, Erosion Control - Temporary, Landscaping - Seeding, Directional Bore, Watershed Protection/Riprap, Directional Drilling, Dams/Reservoirs, Sitework/Excavating and Grading, Grubbing & Clearing, Landscaping (Tree Trimming/Cutting), Water Utilities, Trenchless Utility Construction, Bored Conduit, Traffic Control, Wetland Mitigation, Landscaping (Native Management), Buildings Modular, Geotechnical, Jack and Bore / Sewer / Water Construction, Concrete Pavement, Water Resources (River/Stream), Fish Passage, Masonry Construction & Restoration, Culverts, Waterways, Stormwater Channels, Drainage, Dredging, Ditches and Canals Construction of Boulder Grade Control Structures and Rock Arch Rapids to stabilize the Linn Grove Dam and Little Sioux River. Work will consist of "IN-RIVER" grading, revetment bank stabilization, riprap & boulder placement, as well as steel sheet pile installation, and trenchless water main installation. In addition, upland work will include concrete flat work & cast in place steps, trenched water main installation, landscaping, erosion & sediment control, and restoration. Temporary Erosion & Sediment Control Measures and SWPPP Management || Dewatering and River Diversion || 5 Acres of Tree Clearing and Grubbing || 56,600 Cubic Yards of Class 10, 13, and 20 Excavation and Topsoil Salvage & Respread || 48,100 Tons Macadam, Class B, D, and Erosion Stone Revetment || 16,300 Tons Fieldstone Boulders || 23,000 Square Yards Geotextile Fabric || 2,100 Tons of Granular Subbase Materials || 20,500 Square Feet Steel Sheet Pile || Installation of 1400 Linear Feet of 4" and 6" Water Main Pipe (Trenchless and Trenched) || 8 Acres of Temporary and Permanent Vegetation Restoration || Landscape Plantings, Limestone Blocks and Wildlife Habitat Features || Restroom Building and Parking & Walking Areas || Vegetation Maintenance and Warranty Est. Completion Date: July 31, 2024 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |