Similar Projects
Foote Memorial Park (8) Har-Tru Clay Tennis Courts Annual Spring Recondition
Post-Bid
Branford, CT 06405

Design/Build of the Meriden Skate Park
New Construction
Post-Bid
Meriden, CT 06451

Tennis Court Replacement at Doolittle Park
Results
Wallingford, CT 06492

Park Pavilion/Bathroom Facility at Salt Meadow Park
New Construction
Results
Madison, CT 06443

Construction of Mill Street Park
New Construction
Post-Bid
$300,000 est. value
Waterbury, CT 06706

Synthetic Turf Field and Track Replacement at Guilford High School
Results
Guilford, CT 06437

Library Park Phase 2 Improvements
New Construction
Post-Bid
$300,000 est. value
Waterbury, CT 06702

WDC Construction Of 909 Bank Street Park
New Construction
Results
Waterbury, CT 06702

Woodland High School Track Replacement Project
Renovation
Post-Bid
$300,000 est. value
Beacon Falls, CT 06403

Waterbury Naugatuck River Greenway Phase 1
New Construction
Results
Waterbury, CT

Foote Memorial Park Basketball Court and Veterans Memorial Park Tennis Courts Renovations
Renovation
Post-Bid
$500,000 est. value
Branford, CT

Tennis Court Replacement - High Plains Community Center
Results
$100,000 to $200,000 est. value
Orange, CT 06477

East Haven Gazebo on the Green
Renovation - 1,298 SF
Post-Bid
$100,000 est. value
East Haven, CT

Fairmont Park Field Renovations
Results
New Haven, CT

Washington Park Upgrades
Renovation
Post-Bid
$200,000 est. value
Meriden, CT 06450

Last Updated 06/23/2022 07:31 AM
Project Title

Furnish and Install Pre-Fab Steel Roof Dugouts and Benches

Physical Address View project details and contacts
City, State (County) Wallingford, CT 06492   (New Haven County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a playground / park / athletic field in Wallingford, Connecticut. Completed plans call for site work for a playground / park / athletic field.The Town of Wallingford is seeking bids for Furnish and Install Pre-Fab Roof Dugouts and Benches. Two (2) factory pre-fabricated steel roof dugout structures and two (2) team benches are to be supplied in accordance with project plans and specifications and be delivered to the jobsite. Unloading of materials and erection will be conducted by others. Clarification Deadline: 5/11/2022 5:00 PM

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents