Similar Projects
SR 4019 over Brush Creek
Renovation
Design
North Huntingdon, PA

SR 191,196 and T367 Safety Improvement
Infrastructure
Design
$2,000,000 est. value
PA

Rehabilitation of Bridges
Infrastructure
Bidding
$600,000 CJ est. value
Greensburg, PA 15601

2022 Collection System Point Repairs, Edgewood Road and Ivy Alley Rebid
Infrastructure
Bidding
$200,000 CJ est. value
New Kensington, PA 15068

Traffic Line Painting and Marking Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Penn Township, PA 15642

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

2021 Pump Station Installation Project (Alcoa, Milligantown, SR 780, Melwood)
Post-Bid
New Kensington, PA 15069

Jacobs Creek Watershed Association of Westmoreland County (Contract No. 21-Sw1)
New Construction, Renovation
Results
$100,000 est. value
Scottdale, PA 15683

Construct Hangars, Phase II (Site Work, Utilities and Repairs)
New Construction, Infrastructure
Results
Latrobe, PA

Morning Sun Senior Lofts
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Youngwood, PA 15697

Site Work Associated With Mail Delivery Facility Commerce Crossing at Westmoreland
Infrastructure
Bidding
$300,000 CJ est. value
Sewickley Township, PA 15637

George R. Sweeney Water Treatment Plant Raw Water Pump Station Upgrades - General/Mechanical
Addition
Post-Bid
Greensburg, PA

2021 CDBG Demolition and Site Clearance Project -Phase I
Demolition, Infrastructure
Results
Monessen, PA

Westmoreland County Prison Storage Building
Renovation, Infrastructure - 1 SF
Bidding
$300,000 CJ est. value
Greensburg, PA 15601

Bridgeport Pump Station Pump 2 Replacement
Addition
Post-Bid
Mount Pleasant, PA

Last Updated 07/28/2022 11:16 AM
Project Title

Main Pump Station Rehabilitation General/Mechanical

Physical Address View project details and contacts
City, State (County) Murrysville, PA 15668   (Westmoreland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,781,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Main Pump Station Rehabilitation General / Mechanical and Electrical All Bid Proposals must be accompanied by a Bid Bond which shall have, as security therefore, either a Corporate Surety or a certified or cashier's check payable to the Franklin Township Municipal Sanitary Authority, same to be in an amount equal to ten percent (10%) of the total Base Bid Proposal submitted. All Corporate Sureties must be registered in the State of Pennsylvania. No bid may be withdrawn for ninety (90) days after the same has been filed with the Franklin Township Municipal Authority. All Contractors must adhere to Act 127 of 2012 (Public Works Employment Verification Act). The Pennsylvania Prevailing Wage Requirements do apply to this project. The Franklin Township Municipal Sanitary Authority reserves the right to reject any or all bids or to waive any informality in Bid Proposals or procedures.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents