Similar Projects
Railroad Bridge Construction
New Construction, Infrastructure
Bidding
Downers Grove, IL

T10 Mcdowell Trunk Sewer Phase 1
Infrastructure
Bidding
Naperville, IL

I-20-4722 Bridge Construction O`Hare To Westbound Il Rt 390 Ramp
Post-Bid
Less than $10,000,000 est. value
Downers Grove, IL 60515

FY21 Sanitary Mainline, Hydrant and Valve Improvement Program - Material Procurement
Post-Bid
Bloomingdale, IL 60108

Replace a Pedestrian Bridge
Results
IL

Sanitary Sewer Lateral Connection Testing and Sealing
Results
Less than $40,000 est. value
Bloomingdale, IL 60108

2022 Sanitary Sewer Smoke Testing Tributaires
Infrastructure
Bidding
Naperville, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

2021 Sanitary Sewer Lining - CIPP
Results
Less than $171,175 est. value
Winfield, IL 60190

This Improvement Consists of Repairing Damaged Concrete Barrier Wall, Bridge Parapet, Retaining Walls and Wooden Sound Wall
Renovation, Infrastructure
Bidding

Sanitary, Grease Trap and Storm Basin Pumping, Jetting and Cleaning 20-134-FM
Post-Bid
Wheaton, IL

Cooley-East Street Sanitary Sewer Replacement
Results
Less than $175,600 est. value
Winfield, IL

Sanitary Sewer Televising and Cleaning
Infrastructure
Bidding
Woodridge, IL

North Pump Station Intersector Sanitary Sewer Phase 4
Post-Bid
Naperville, IL

Sewer Main Rehabilitation
Results
Wheaton, IL

Last Updated 03/30/2022 01:08 AM
Project Title

I-21-4820 Bridge Rehab Tri-State Tollway (I-294)I-294/I-55 Ramp Ab Over Sewage Disposal

Physical Address View project details and contacts
City, State (County) Downers Grove, IL   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes, but is not limited to, the rehabilitation of the I-294/I-55 Ramp AB Bridge over Sewage Disposal Road (Bridge No. 245), scarifying and overlaying the existing bridge deck, partial depth deck repairs and substructure repairs, maintaining underpass lighting, maintenance of traffic and other miscellaneous work.

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents