Similar Projects
New Park and Ride Facility - City of Sanford
Infrastructure, Renovation
Conception
$1,596,000 CJ est. value
Sanford, ME 04073

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

Pearl Street Redevelopment
New Construction, Infrastructure
Design
Biddeford, ME 04005

Walnut Street Collection System Upgrade
Infrastructure
Bidding
$1,400,000 CJ est. value
Old Orchard Beach, ME 04064

Dunkin / Limerick
New Construction, Infrastructure
Bidding
$382,165 CJ est. value
Limerick, ME 04048

Running Track Repairs - Old Orchard Beach High School
Infrastructure
Post-Bid
Old Orchard Beach, ME 04064

Construction Services - Emery Field Phase 2
New Construction, Infrastructure
Post-Bid
Kittery, ME 03904

Statewide Geotechnical Drilling
Infrastructure
Results

Forbes Pocket Park
New Construction
Results
Wells, ME 04090

Cape Arundel Cottage Preserve Phase 6
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Arundel, ME 04046

Eastview Village Condo Flats
New Construction, Infrastructure - 75,182 SF
Pending Verification
$20,000,000 CJ est. value
Saco, ME 04072

507 Main Street Multi-Tenant Commercial Building
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Saco, ME 04072

Gooch Street Mixed-Use Development
New Construction, Build-out, Infrastructure - 39,556 SF
Design
$7,000,000 CJ est. value
Biddeford, ME 04005

West Apron Reconstruction at Airport
Infrastructure
Bidding
$525,000 CJ est. value
Biddeford, ME 04005

Rachel Carson Multi-Purpose Facility
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Kennebunk, ME 04043

Last Updated 03/03/2023 12:34 PM
Project Title

RFP D/B - Memorial Field Playgrounds

Physical Address View project details and contacts
City, State (County) Berwick, ME 03901   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Berwick (Town) is requesting proposals to design, provide and install playground equipment and fall zone material in connection with Memorial Park. The Town will select one supplier to provide equipment and materials for the park as outlined in this request. The Department of Parks & Recreation will be available to review the project list. If there are any questions, please contact the Parks & Recreation Director, Josh Jones to answer any question from prospective bidders at 1-207-698-1101 ext. 117, or the second floor of Town Hall, 11 Sullivan Street, and Berwick. This project consists of the design, procurement and installation of a playground system including fall zone material at Memorial Park located at 25 Sweetser St, Berwick, ME 03901. Work is to include the design of a play system within the constructed play area boundaries, as well as the installation of commercial grade playground equipment, equipment footings, landing mats, and fall zone material. All equipment will be assembled and installed by the Supplier or will supervise the assembly and installation by a subcontractor. The Town of Berwick requires Suppliers to design a play system that meets or exceeds all current federal CPSC, ASTM, IPEMA standards and ADA requirements. The proposals shall include the costs of delivered play systems as designed, inclusive of the equipment structures, components, hardware, detailed technical installation instructions and maintenance & operations manuals from the manufacturer. Playground Suppliers shall provide (2) two sketch-level conceptual designs and itemized pricing. Suppliers should base their playground equipment designs on meeting all accessibility and safety standards as well as the guidelines & specifications listed in this RFP. Quality of equipment components, quality of design, play value, cost, and appropriateness to location and target demographic must be taken into consideration in the design of the play system. The total dollar amount allocated to Phase I of this project is $100,000.00. Please provide future phasing and cost estimates to complete the project over a three-year period. The Town of Berwick reserves the right to negotiate an agreement based on fair and reasonable compensation for the scope of work and services proposed, as well as the right to reject any and all responses deemed unqualified, unsatisfactory or inappropriate at the sole discretion of the Town of Berwick. The Select Board may act upon the bids at that time, or alternately may take them under consideration for action at a subsequent meeting. The Town reserves the right to select or reject any and/or all bids or bid components as may be in its best interests.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents