Similar Projects
AutoZone #6521 / Portland
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Portland, MI 48875

AutoZone #6521 / Portland
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Portland, MI 48875

M-66 M-44 Car Pool Lot
Infrastructure
Post-Bid
Ionia, MI

Jordan Lake Grand River Avenue Car Pool Lot
Infrastructure
Post-Bid
Ionia, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Calumet-Swedetown Trail Capping, And Route Grading
Results

Portland Road Grand River Avenue Car Pool Lot
Infrastructure
Post-Bid
Ionia, MI

Baldie and High Street Resurfacing
Results
$450,000 est. value
Ionia, MI 48846

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Quanicassee River BAS - Improvements
Results

2021 Gravel Processing
Infrastructure
Post-Bid
MI

Site Improvements
Infrastructure
Results
Ionia, MI 48846

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Road Repair - Skip Paving, HMA
Infrastructure
Results

Branch Street Reconstruction
Infrastructure
Post-Bid
Ionia, MI 48846

Last Updated 08/11/2022 08:02 AM
Project Title

Phase 1 - Paving and Landscaping

Physical Address View project details and contacts
City, State (County) Belding, MI 48809   (Ionia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner is soliciting proposals for qualified bidders to perform work on various portions of the project. Triangle Associates, Inc. is the Construction Manager for the Owner under an Adviser Agreement. Specialty contractors are being solicited at this time for the following: Asphalt Sealcoating & Striping Sitework Prevailing wages (do not) apply to this project. Payment and Performance Bonds are Required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents