Similar Projects
South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

Transmission Mains - Southeast Mesa - CP0828 - City of Mesa
Infrastructure
Conception
$866,058 est. value
Mesa, AZ

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Chandler Boulevard Waterline Replacement (Chippewa Place to Meadows Drive)
Results
$1,800,000 to $2,200,000 est. value
Chandler, AZ 85224

Mandarina Off-Site Water & Sewer
Infrastructure
Construction
Marana, AZ

Water Distribution System Replacement
Renovation
Construction
$500,000 est. value
Tucson, AZ 85750

Water Reclamation Facilities Upgrades and Improvements - City of Tempe
Alteration
Conception
$27,471,367 est. value
Tempe, AZ

Destination at Gateway (Berge) Offsite Paving and Waterline Williams Field Road
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Mesa, AZ 85212

Festival Ranch Parcel T1 16" Infrastructure Waterline
Post-Bid
Sun City, AZ

Huntington Waterline Replacement Project
Results
Flagstaff, AZ

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Reported 07/19/2022 10:36 AM
Project Title

Main Tanks Transmission Line Phase II - City of Kingman

Physical Address View project details and contacts
City, State (County) Kingman, AZ   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $2,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Kingman, Arizona. Conceptual plans call for site work for a water / sewer project. 2+ miles of 24" Ductile Iron Transmission Main on Riata Valley Road and Stockton Hill Road to Main Tank Farm. Direct transmission from Castle Rock Booster Station to Main Tank farm. As of July 15, 2022, this project is currently in the FY 2022-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents