Similar Projects
Spacebox Storage
Renovation
Conception
Laurel, MS 39440

Thacker Self Storage Facility
New Construction - 19,200 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Oxford, MS

AAA Self Storage Addition
New Construction, Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39531

Louisville Industrial Warehouse Improvements
Renovation
Post-Bid
$225,000 est. value
Louisville, MS

Town of Ashland - Municipal Complex Building
New Construction
Post-Bid
Ashland, MS

Gulfport Redevelopment Project at the Gulfport Job Corps Center
New Construction - 635,323 SF
Results
$10,000,000 est. value
Gulfport, MS 39501

New Way Trucks Building Improvements
New Construction
Results
$1,126,700 est. value
Booneville, MS

Brookwood Storage
New Construction - 115,550 SF
Construction
$10,000,000 CJ est. value
Ocean Springs, MS 39564

Cooperative Energy - Benndale
New Construction - 6,500 SF
Construction
Lucedale, MS 39452

Amazon - Fulfillment Center
New Construction
Pending Verification
Byhalia, MS

Walmart Fulfillment Center
New Construction - 1,000,000 SF
Pending Verification
$10,000,000 CJ est. value
Olive Branch, MS 38654

Pre Engineered Metal Building
New Construction
Post-Bid
Perkinston, MS 39573

Lamar County Fire Training Facility and EMA Dry Storage Warehouse
New Construction
Results
Purvis, MS

Associated Wholesale Grocers
New Construction - 918,000 SF
Construction
$300,000,000 est. value
Hernando, MS 38632

Mini Warehouses
New Construction
Pending Verification
Olive Branch, MS 38654

Last Updated 10/31/2022 01:34 PM
Project Title

Tiffany Lane Accessory Building

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39532   (Harrison County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 1 2021, The project is is working drawings on hold. This will be for an accessory building for storage.

Details

3,793 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents