Similar Projects
City of St. Marys Tomlinson Substation
Post-Bid
Saint Marys, OH

Big Run Maintenance Conversion
Post-Bid
Less than $250,000 est. value
Columbus, OH 43205

Energy Service Providers for Self Funding Energy Efficiency Improvements
Results
South Euclid, OH

Z--Re-Solicitation - Upgrade UPS and AC
Results
$500,000 to $1,000,000 est. value
Clifton, OH 45220

LED Lighting Upgrades
Post-Bid
Less than $129,408 est. value
Middletown, OH 45044

MSC 308 Digital Forensics
Results
Less than $178,225 est. value
Bowling Green, OH 43402

Design-Build Services for On-Site Solar Photo Voltaic Installations at City of Cleveland Facilities
Post-Bid
Cleveland, OH 44114

2500 KVA Transformer
Results
Hamilton, OH

USAF Install Redundant Cooler WPAFB, OH
Post-Bid
$1,000,000 to $5,000,000 est. value
Wright Patterson Air Force Base, OH

Energy Conservation and Facility Infrastructure Improvement Project
Renovation - 408,664 SF
Results
Toledo, OH 43604

Campground West Loop Electrification
Post-Bid
Less than $110,000 est. value
Fremont, OH 43431

Solar Power Developers
Results
Kent, OH

JPWWTP- Electric Gate Actuators
Post-Bid
Columbus, OH

69 KV Underground Cable Replacement
Results
Less than $1,600,000 est. value
Westerville, OH 43081

Generator Inspection and Maintenance Services
Term Contract
Post-Bid
Westerville, OH

Last Updated 08/14/2020 02:17 PM
Project Title

12.47Kv Distribution Circuit Upgrade

Physical Address View project details and contacts
City, State (County) Oak Harbor, OH 43449   (Ottawa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of furnishing all labor, supervision, tools, materials and equipment to complete the project scope as follows: The Village of Oak Harbor is upgrading a portion of their 12.47kV, three-phase, electric distribution system to complete a distribution tie between two circuits. The work will include the replacement of some existing poleline and the installation of some new. The contractor shall be responsible for the furnishing and installation of all transformers (unless noted otherwise), poles, insulators, conductors, protective devices, and miscellaneous distribution system material. The contractor shall be responsible for the installation of one, Village provided padmounted transformer. The work covers approximately 2.2 miles of distribution.

Details

Division 26 - Electrical, Medium-Voltage Circuit Protection Devices.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents