Similar Projects
Carlisle Baptist Church
New Construction - 36,000 SF
Conception
Panama City, FL

Northstar Church
Renovation
Design
Panama City Beach, FL

AutoZone #1073 / Lynn Haven
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Lynn Haven, FL 32444

RFP D/B - FY22 IIJA Gulf Intercoastal Waterway (GIWW) Culvert Replacement
Infrastructure
Bidding
$25,000,000 CJ est. value
Panama City, FL 32401

Safety Project/Traffic Signals
Infrastructure
Bidding
$1,035,797 CJ est. value
Panama City, FL 32404

Northstar Church
Renovation - 24,800 SF
Post-Bid
Panama City, FL

Martin Luther King (MLK) Recreation Center - City of Panama City
New Construction, Renovation, Infrastructure
Post-Bid
$14,700,000 CJ est. value
Panama City, FL 32401

Sudduth Park Site Work Improvements
Renovation, Infrastructure
Results
Panama City, FL

Gore Park Site Work
Renovation, Infrastructure
Results
Callaway, FL 32404

St. Andrews United Methodist Church Hurricane Rebuild
New Construction, Demolition
Construction
$1,500,000 est. value
Panama City, FL 32401

New Bethel Missionary Church
New Construction, Demolition
Construction
Panama City, FL 32401

Air Force Base Rebuild - Tyndall Air Force Base
Demolition, New Construction, Infrastructure
Pending Verification
$3,000,000,000 CJ est. value
Tyndall AFB, FL 32403

Prominence
New Construction, Infrastructure
Pending Verification
$7,700,000 CJ est. value
Grande Pointe, FL 32413

Grace Point Condos
New Construction, Infrastructure - 10,000 SF
Design
$7,500,000 CJ est. value
P C Beach, FL 32413

East Terminal Westrock Rail Rehabilitation - Phase II
Infrastructure
Bidding
$7,000,000 CJ est. value
Panama City, FL 32401

Last Updated 10/24/2022 02:08 PM
Project Title

Harvest Worship Center - Phase 1, 2 & 3

Physical Address View project details and contacts
City, State (County) Panama City, FL 32405   (Bay County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*As of August 30, 2022, all trades have not been awarded yet. The General Contractor is still working on, and is still taking in bids for, Phase 1. A construction timeline has not been established at this point. Horsley Construction would like to invite you to Bid Harvest Worship Center project. Their will be three phases to the project. We are only Bidding Phase 1 at this point. The MEP is a design build proposal for a complete functioning building. There is phase 2 & 3 expansion that the MEP should allow for future tie in points for phases 2 & 3. All proposals can have VE recommendations for savings. Copies of the plans for your bid can be provided upon request. Please Confirm you will be providing a proposal for this project.

Details

2 Stories Above Grade, 19,686 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents