Similar Projects
2022 Meter Change-Out Project, Phase 1
Infrastructure
Design
$300,000 CJ est. value
Tuscaloosa, AL 35401

2022 Meter Change-Out Project, Phase 1
Infrastructure
Design
$300,000 CJ est. value
Tuscaloosa, AL 35401

JCDH Public Health Pavilion
Addition, New Construction, Infrastructure, Renovation
Bidding
$438,000 CJ est. value
Birmingham, AL 35233

JCDH Public Health Pavilion
Addition, New Construction, Infrastructure, Renovation
Bidding
$438,000 CJ est. value
Birmingham, AL 35233

Feathered Oaks Apartments
New Construction, Infrastructure
Sub-Bidding
$14,000,000 CJ est. value
Scottsboro, AL 35769

Water Main Replacement on Glenn Street and Hwy 52 to Morris Street Tank
Post-Bid
Geneva, AL 36340

2021 Water Main Rehabilitations and Extensions
Post-Bid
Alabaster, AL

Craft Highway 20" Water Main
Results
Mobile, Prichard, AL

2021 Water Supply Improvements - Elevated Water Storage Tank Project
Results
Moundville, AL

Oak Bowery Pines
New Construction
Construction
Opelika, AL 36801

Rural King - Building and Site Work
New Construction, Infrastructure - 86,439 SF
Construction
Albertville, AL

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

Austal USA Auxiliary Floating Dry Dock / Mobile
Infrastructure
Pending Verification
$128,100,000 CJ est. value
Mobile, AL 36602

Semmes Community Center Park - Shade Structures
Infrastructure
Design
$90,000 CJ est. value
Semmes, AL 36575

Lower Valley Wastewater Treatment Plant Upgrades
Renovation, Infrastructure
Bidding
$1,856,000 CJ est. value
Valley, AL 36854

Last Updated 08/30/2022 05:09 PM
Project Title

New 12 Water Main on Pea Ridge Road in Association With Provalus (Labor/Equipment Only)

Physical Address View project details and contacts
City, State (County) Brewton, AL 36426   (Escambia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $662,781 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of Installation (Labor/Equipment Only) of approximately 16,000 LF of 12 PVC Water Main and related appurtenances (Materials furnished by the Owner). EDA PROJECT NO.: 04-01-07272, and DRA PROJECT NO.: AL-51084. Guarantee will be required with each bid for at least 5% of the amount of the bid filed in the form of a certified check, Bid Bond, or irrevocable Letter of Credit acceptable to the owner payable to the City of Brewton, AL. Bid Bonds shall include certification that the bonding company is listed in Circular 570 of the U.S. Treasury Department. The name, address, telephone number, and contact person for the bonding company shall also be included. The successful bidder will be required to submit 100% performance and payment bonds or an irrevocable Letter of Credit which is acceptable to the Owner. All bonds and letters of credit shall be for 100% of the contract price. Attention of Bidders is called to the license required by Title 34, Chapter 8, of the code of Alabama, 1975, and amendments thereto, relating to the licensing of General Contractors. No bid will be accepted from anyone, except a qualified Contractor, licensed by the State Licensing Board for General Contractors, unless otherwise required by the State Licensing Board. Each BIDDER must put his License Number, Category, and License Expiration Date on the outside of his sealed envelope. The City of Brewton, AL is an equal opportunity employer and encourages the participation of women and minority owned businesses (OMBEs) and Section 3 qualified contractors in all project contract procurements. All bidders must comply with the Presidents Executive Order Number 11246 which prohibits discrimination in employment regarding race, creed, color, sex or national origin. All bidders must comply with title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act and the Contract Workhours Act. The attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract, Section 3, Segregated Facilities, Section 109 and E.O. 11246. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with requirements of the Contractors Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents