Similar Projects
Last Updated | 02/02/2023 03:44 PM |
Project Title | Blackhawk Technical College Public Safety Training Center Education Building - Bid Package 2: Re-Bid of Drywall and Landscaping Work Packages |
Physical Address | View project details and contacts |
City, State (County) | Janesville, WI 53546 (Rock County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: Bid Package 2: Re-bid of Drywall and Landscaping Work Packages. The Work for Which Bids Are Asked Includes, but Not Necessarily Limited to, Furnishing All Labor, Materials, Tools, and Equipment Necessary for the Construction of a New 74,695 Sf Public Safety Training Center Education Building Located at 6004 South County Hwy G in Janesville, Wi 53546. The Work for Which Bids Are Asked Includes, but Not Necessarily Limited to, Furnishing All Labor, Materials, Tools, and Equipment Necessary for the New Btc Pstc Education Building Located in the Town of Rock, North of Central Campus at 6004 South County Hwy G, Janesville, Wi 53546. The Bids Will Include Rebid of Metal Studs and Gypsum Boards and Landscaping Scope. All Other Scopes Have Been Previously Awarded. All Work Will Be Issued Under a Sub-contract to the Construction Manager, Jp Cullen. To Assure Proper Coordination and Completion of Each Bid Package Under This Project, the Contractor Shall Collaborate With All Trades and Material Suppliers. The Alternate Bid Prices Being Requested for Are Included on the Bid Form and Identified in Technical Specification Section 01 23 00. The Contractor Manager Will Generate a Single Submittal Log, Submittal File in the Job Trailer, and Single Construction Schedule. All Work Will Be Issued Under a Single Prime Contract to Jp Cullen for General Construction. Pre-bid Site Visit: None Time: Subcontractor Bids Will Be Received at Btc Administration Building The Bidder is to Include the Added Cost to Furnish the Payment and Performance Bond on His or Her Bid. The Surety Company Shall Be Licensed to Do Business in Wisconsin. The Bond Must Be Dated the Same Date of the Contract. A Certified Copy of Power of Attorney Shall Be Provided by the Surety Company Showing That the Agent Who Signs the Bond Has the Power of Attorney to So Sign for the Surety. Bid Rejection: Blackhawk Technical College Reserves the Right to Reject Any and All Bids, Waive Any Informalities in Bidding, or to Accept the Bid or Bids, Which Best Serve the Interests of the Owner. Bid Withdrawal: No Bid Shall Be Withdrawn for a Period of Sixty 60 Days After the Schedule Opening of the Bids Without the Consent of the Owner. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |