Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

RFP D/B - Four Golf Course Tees
Infrastructure
Design
$200,000 CJ est. value
Portsmouth, NH 03801

Addition / Fire Station 3
Addition, Demolition, Infrastructure - 360 SF
Bidding
$400,000 CJ est. value
Swanzey, NH 03446

Boucher Site Renovations
Infrastructure
Bidding
$78,016 est. value
Concord, NH 03303

Statewide W Guardrail
Infrastructure
Sub-Bidding
$1,468,260 CJ est. value
Warren, NH 03279

Backstop Fencing on Two Ballfields Replaced
Infrastructure
Sub-Bidding
$60,000 CJ est. value
Wakefield, NH 03872

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

As-Needed Earthwork Repair Services
Term Contract
Post-Bid
Laconia, NH

ECTC Site Improvements
Infrastructure
Results
$2,663,280 est. value
Pembroke, NH 03275

Site Improvements and MOV Canopy Construction
Infrastructure
Results
$960,000 est. value
Hillsboro, NH 03244

Nansen Ski Jump - Sitework
New Construction
Construction
Milan, NH 03588

Sitework for 2 Retail Buildings
New Construction - 11,225 SF
Construction
Epping, NH 03042

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Last Updated 08/10/2022 09:03 AM
Project Title

Installation and Extraction of Seasonal Docks and Extension Piles (Autumn 2022 and Spring 2023)

Physical Address View project details and contacts
City, State (County) Bristol, NH 03222   (Grafton County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,850 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The New Hampshire Fish and Game Department (NHFG) requires an autumn 2022 extraction and spring 2023 install of three (3) temporary steel extension piles for the seasonal dock at NHFG's Wellington State Park boat ramp in Bristol, NH that accesses Newfound Lake. In addition, the NHFG seeks assistance retrieving and deploying the seasonal floating dock and gangway system associated with the extension piles. The assistance can be provided without resetting the crane position or configuration. The Contractor shall provide all necessary and appropriate strapping or cabling ("strapping") to NHFG personnel for securing to the dock segments, gangway and extension piles to complete this project. NHFG will provide a boat to support the extension pile and dock retrieval/deployment activity as needed. The Contractor will not need to supply a diver. The dock consists of two wood-framed floating dock segments. The inner (landward) segment is (8) feet wide by twenty-two (22) feet long by two and one-half (2.5+/-) feet deep. The second (outer) segment is eight (8) feet wide by twenty (20) feet long by two and one-half (2.5+/-) feet deep. When in service the two segments are bolted to each other and are accessed from shore by a thirty (30) feet long by four (4) feet wide aluminum gangway. The dock segments weigh approximately 4,200 to 4,500 pounds each. Each dock segment has pile slots enclosed by a piece of decking that can be removed to receive piles. The outer pile is secured to the outer-lake-end of the dock segment via a removable metal chain that attaches to the end of the dock segment and surrounds the pile. Please refer to the pictures in the supporting documents. Each seasonal extension pile is steel pipe with an 8.625-inch OD and 0.375-inch thick walls; about 16 feet long and weighs about 600 pounds. They are fitted into permanent 10-inch ID steel pipes ("sleeve piles") located below water. The top of each extension pile has a centrally located pick point ring. The nominal dimensions of the insideopening of the ring are 2-inch wide by 5-inch tall; and the diameter of the steel-ring-bar is 1.5-inch. The distance to the furthest piling is about 80 feet from the shoreline. The winter storage area in the parking lot for the dock segments is about 80 feet from shore. The water depth varies from 4 to 7 feet at the pile locations. There is an underground electric wire between the restroom and the overhead light at the ramp. Other than the overhead light at the ramp, there are no overhead wire lines in the vicinity of the set up location. Contractor is responsible for protecting all facility infrastructure including, but not limited to, the concrete ramp surface, dock abutment and asphalt pavement during project activities and for repairing any damage that may occur. NHFG will select the Contractor based on the lowest LUMP SUM bid. Payments will be made in two increments. Half the LUMP SUM will be paid after the completed extraction and the balance paid after the completed insertion. Questions about the project may be submitted by email to Garret Graaskamp (NHFG Statewide Boat Access Program Coordinator) at garret.graaskamp@wildlife.nh.gov no later than 4:00 pm on Friday, July 22, 2022.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents