Similar Projects
Mill, CMRB, Patch, HMA
Infrastructure
Bidding
$8,000,000 CJ est. value
Chesterfield, SC 29709

Mill, CMRB, Patch, HMA
Infrastructure
Bidding
$8,000,000 CJ est. value
Chesterfield, SC 29709

Town of Cheraw Stormwater Infrastructure
Infrastructure
Post-Bid
$9,193,020 CJ est. value
Cheraw, SC 29520

Cheraw Fish Hatchery Assistant Managers Residence Bathroom Addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$50,000 CJ est. value
Cheraw, SC 29520

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Pageland Sewer Rehabilitation Project
Infrastructure
Results
$2,240,627 CJ est. value
Pageland, SC 29728

Cheraw Tank Farm Relocation
New Construction, Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Cheraw, SC 29520

McBee Elevated Tank Rehabilitation Project
Infrastructure
Results
$567,000 CJ est. value
McBee, SC 29101

Gravity Sewer I/I Study and Acquisition and Installation of Emergency Standby Propane Generators with Automatic Transfer Switches
Renovation, Infrastructure
Post-Bid
$750,000 CJ est. value
Chesterfield, SC 29709

Runway Rehabilitation
Infrastructure
Results
$5,847,265 CJ est. value
Cheraw, SC 29520

Water Plant Improvements - 2022
Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Cheraw, SC 29520

Chesterfield County Rural Water Company - Tory Road Multi-Column Elevated Tank 2
Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Chesterfield, SC 29709

Alpha Behavioral Health Center / Chesterfield
New Construction, Infrastructure - 5,822 SF
Post-Bid
$3,382,582 CJ est. value
Chesterfield, SC 29709

Playground Equipment - Rebid
Infrastructure
Post-Bid
$20,000 CJ est. value
Pageland, SC 29728

Lynches River Industrial Park - Watermain Extension
Infrastructure
Post-Bid
$300,000 CJ est. value
Pageland, SC 29728

Last Updated 12/20/2023 02:03 PM
Project Title

Biscuitville / Boiling Springs - Rebid

Physical Address View project details and contacts
City, State (County) Pageland, SC 29728   (Chesterfield County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

An awarded general contractor has been announced. Construction began in December 2023 and the restaurant will open April 2024.

Details

1 Story Above Grade, 2,872 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents