Similar Projects
Massasoit Estates
New Construction
Conception
Taunton, MA

Friend Street Subdivision
New Construction
Conception
Freetown, MA 02702

Bakerville Woods
New Construction
Design
Dartmouth, MA 02747

Caswell Street Subdivision
New Construction
Design
Taunton, MA

478-480 Union Street Homeownership Development
Bidding
New Bedford, MA

HILAPP Phase II - Roofing, Siding, Windows, Door and Porch Trim Replacement - General Bid
Bidding
Less than $3,489,000 est. value
New Bedford, MA 02740

HILAPP Phase II - Roofing, Siding, Windows, Door and Porch Trim Replacement - Filed Sub-bids
Sub-Bidding
Less than $3,489,000 est. value
New Bedford, MA 02740

2020 On-Call Trades Contract
Post-Bid
Less than $25,000 est. value
Fall River, MA

Disposition of Municipal Property for the Development of Affordable Housing
Post-Bid
Westport, MA

2019 On-Call Trades Contract
Results
$25,000 est. value
Fall River, MA

Kitchen Upgrade
Results
Less than $34,600 est. value
Attleboro, MA 02703

Fuller Estates
New Construction
Construction
Taunton, MA 02780

Bella Rose Estates
New Construction
Pending Verification
Taunton, MA

Fisher Estates
New Construction
Design
Somerset, MA

Kitchen & Flooring Renovations - Unit Vacancy Reduction 2, Maple Gardens 200-2 - Filed Sub-Bids Due
Renovation
Results
$506,688 est. value
Fall River, MA 02721

Reported 10/10/2019 12:00 AM
Project Title

ADA Reasonable Accommodation Roll-In Shower, Elm Terrace 667-2

Physical Address View project details and contacts
City, State (County) North Attleborough, MA   (Bristol County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $18,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of: the removal and replacement of existing tub and ceramic tile surround with new handicap accessible fiberglass shower assembly. Work also includes asbestos abatement of the resilient flooring and installation of new flooring, metal studs, drywall, shelving, floor drain assembly for shower, and painting. Work is confined to one fourth floor unit along with ceiling soffit modifications in third floor unit below required to install new drainage line.
Details
Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.
Division 05 - Metals.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents