Similar Projects
Public Side Lead Water Service Replacements II
Infrastructure
Results
Janesville, WI

Water and Sewer System Improvements II
Infrastructure
Results
Janesville, WI

Clinton Crossings Sewer and Water Extension
Infrastructure
Results
$400,000 est. value
Clinton, WI

Madison Avenue Water Main Replacement
Infrastructure
Results
$200,000 est. value
Milton, WI 53563

Utility Structure Rehabilitation and Replacement
Infrastructure
Results
$1,350,000 est. value
Janesville, WI

Gateway Pressure Reducing Valve and Vault
Infrastructure
Results
Beloit, WI 53511

2021 Water Service Replacements
Infrastructure
Results
$60,000 est. value
Milton, WI

Public Side Lead Water Service Replacements I
Infrastructure
Results
Janesville, WI

2021 Street and Utility Improvements
Results
Milton, WI 53563

Water And Sewer System Improvements II
Results
$1,800,000 est. value
Janesville, WI

Euclid Avenue Reconstruction; Phase 1 and 2
Infrastructure
Results
Beloit, WI 53511

Sherwood Drive Utility Extension
Infrastructure
Results
Beloit, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Water and Sewer System Improvements I
Infrastructure
Results
Janesville, WI

Fulton Street Extension Improvements
Infrastructure
Results
$255,000 est. value
Janesville, WI 53546

Reported 06/29/2022 12:00 AM
Project Title

2022 Water Service Replacements

Physical Address View project details and contacts
City, State (County) Milton, WI   (Rock County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of replacement of utility owned water service lines between the water main in the street and the curb box in the terrace, sidewalk or driveway. The Owner will inform the Contractor of services to be replaced on an as needed basis. Work must be completed within 28 calendar days of said notification or before the project completion date, whichever comes first. Work includes excavation, service materials and installation, reconnection to private service line, abandonment of existing service lines, backfilling with granular materials, compaction, installation of sixteen inches of aggregate base below pavements, traffic control, turf restoration and other miscellaneous items of work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents