Similar Projects
Wastewater Treatment Plant Expansion - River Ridge Development Authority
Infrastructure
Conception
$40,000,000 est. value
Jeffersonville, IN 47130

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

Building 764 Addition and Alteration
Addition, Demolition, Renovation, Infrastructure - 20,493 SF
Bidding
$10,000,000 CJ est. value
Fort Wayne, IN 46809

Water Reclamation Facility Expansion
Infrastructure
Bidding
$215,000 CJ est. value
Charlestown, IN 47111

Reserve on Park Public Improvements and Roadway Extension
Infrastructure
Sub-Bidding
$535,000 CJ est. value
Fort Wayne, IN 46845

Sanitary Collection System and WWTP Upgrades
Renovation, Infrastructure
Post-Bid
Elizabethtown, IN

Brown County State Park Drinking Water Improvements Divisions I and II
Infrastructure
Post-Bid
$200,000 est. value
Nashville, IN 47448

River Ridge Elevated Water Storage Tanks
Results
Jeffersonville, IN 47130

Reverse Osmosis System Upgrade
Results
$25,000 to $100,000 est. value
Fort Wayne, IN

Scooter's Coffee / Decatur
New Construction, Infrastructure - 664 SF
Construction
$200,000 CJ est. value
Decatur, IN 46733

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

Discovery Park Expansion - Muncie Childrens Museum
Addition, Demolition, Infrastructure
Pending Verification
$350,000 CJ est. value
Muncie, IN 47305

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

Last Updated 06/14/2023 08:05 AM
Project Title

Water Improvements

Physical Address View project details and contacts
City, State (County) Hazleton, IN 47640   (Gibson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The project includes but is not limited to rehabilitation of select water treatment plant components including rehabilitation of the existing vertical pressure filters, replacement of filter media, replacement of the existing filter valves, replacement of 3 gate valves, replacement of the existing casework, lab sink, etc., and rehabilitation of one high service pump. The work also includes rehabilitation of one existing well, modifications to one existing well structure, replacement of a 6" water line across Robb Creek, rehabilitation of the existing standpipe, installation of a new mixing system in the existing standpipe, plus installation of an altitude valve and associated piping at the tank site and all other work required for the complete project. All interested citizens are invited to attend and should any citizens require special provisions, such as handicapped modifications or non-English translation personnel, the Town will provide such provisions as long as the request is made by April 7, 2022, by contacting Debbie Bennett-Stearsman at 812-319-9068 Questions pertaining to this project shall be submitted directly to Alan Leistner, P.E. at Commonwealth Engineers, Inc Additional questions concerning access to the website may be directed to Commonwealth Engineers, Inc. at (317) 888-1177 or email to jchipman@contactcei.com. The OWNER reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. NO bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the highest aggregate bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents