Project Title | West Bixby Road Improvement Phase 2 Project |
Physical Address | View project details and contacts |
City, State (County) | Groveport, OH (Franklin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which proposals are invited consists of the furnishing of all labor, materials, equipment and services necessary for rehabilitation of a portion of Bixby Road, west of SR 317, along with other related roadway improvements and for replacement of the Bixby Road culvert over Holton Ditch and its other related improvements (the “Project”). Work to include approximately: Base Bid Part 1 - Bixby Road pavement rehabilitation and Path Improvement – Work to be included in the base bid as ordered by the Council of the City of Groveport: 9,700 square yards of roadway pavement rehabilitation utilizing full depth pavement reclamation and applying 3.5 inches of item 441 asphalt concrete, being about 930 Cubic Yards 3,100 feet of an 8-ft wide asphalt paved shared-use path Misc. roadside drainage improvements including drive culverts and underdrains Pedestrian warning system assembly Various pavement striping and signage Part 2 - Bixby Road culvert replacement over Holton Ditch (FRA-CR229-03.45) - Work to be included in the base bid as ordered by the Franklin County Commissioners: Improvements to be included, as ordered by the Franklin County Commissioners, consist of upgrading 0.01 miles of Bixby Road by replacing the existing concrete slab culvert over Holton County Ditch with a new 12’x8’ 4-sided precast concrete box culvert, with foundation support system and headwalls and minimal roadway approach improvements that support the roadway improvement to be constructed in Part 1 Add/Deduct Alternate Unit prices are requested from the bidder for alternative work for specific pay items in the base bid, as an Add/Deduct Alternate. Work relates to the type of stabilizing agent used in Full Depth Reclamation. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |