Similar Projects
Downtown Boulder Station Expansion
Addition
Conception
$982,000 est. value
Boulder, CO 80305

New Loveland Transit Center
New Construction
Conception
Loveland, CO 80538

New Airport Terminal
New Construction
Design
$26,400,000 est. value
Loveland, CO 80538

Snow Removal Equipment (SRE) Building Expansion
Renovation, Addition
Bidding
$600,000 est. value
Englewood, CO 80112

Construction Manager - General Contractor Services on the Aging Terminal Project
New Construction
Bidding
$2,000,000 to $46,000,000 est. value
Colorado Springs, CO 80916

Airport Terminal Partnership Development Opportunity
New Construction
Post-Bid
Loveland, CO 80537

FLY 026 New Snow Removal Equipment Building
Renovation
Post-Bid
Peyton, CO

Improvements To The Eagle County Regional Airport
Results
Gypsum, CO

Colorado Springs Airport IT Server Room Remodel
Renovation
Results
Less than $340,000 est. value
Colorado Springs, CO 80903

Gunnison Crested Butte Regional Airport Renovation and Expansion
Addition - 47,741 SF
Construction
Gunnison, CO 81230

Grand Junction Regional Airport Rental Car and TSA Checkpoint Renovation
Renovation
Construction
Grand Junction, CO 81506

Denver International Airport (DEN )On-Call General Construction SBE
New Construction, Term Contract
Post-Bid
Denver, CO 80249

Deice Pad and Apron Rehabilitation Yampa Valley Regional Airport
Renovation
Results
Less than $4,256,607 est. value
CO

Archuleta County Airport-Stevens Field Improvements
Renovation
Post-Bid
$900,000 est. value
Pagosa Springs, CO 81147

Bristles 2021 Yampa Valley Regional Airport
New Construction
Results
Hayden, CO 81639

Reported 05/27/2022 12:00 AM
Project Title

Transportation Security Administration (TSA) Queueing Area Construction

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80916   (El Paso County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the existing TSA queueing area to be reconfigured by demolition and renovation of the TSA managers office on the second floor (public area) of the terminal building. The work includes but not limited to wall, ceiling, and floor surface areas to receive new finishes; removal and disposal of existing TSA window wall system and curb; purchase and installation of a new security grille gate system; removal and reconfiguration of existing ceiling systems(suspended and soffits/fascia); and the upgrade of existing MEP components.virtual - https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2I2ZGYyYTAtNTg1Yi00MGMxLWEyM2EtMWRjYjRhMTA5MjU0%40thread.v2/0?context=%7b%22Tid%22%3a%2290f74bf0-a593-4c12-9591-fb8ef4ba6ad1%22%2c%22Oid%22%3a%228a4a6b9e-293a-48fb-aa84-ca3b053cb100%22%7d Or call in (audio only) +1 720-617-3426,,9156951# United States, Denver Phone Conference ID: 915 695 1#

Details

Airline/Passenger Terminal, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents