Similar Projects
On-Call Duct Bank
Bidding
$10,000,000 est. value
Boston, MA

Steam Boiler Replacement Project Walnut Street Apartments
Alteration
Bidding
$245,500 est. value
Brookline, MA 02445

Preventative Maintenance Inspections of Various HVAC Systems
Post-Bid
Less than $35,000 est. value
Braintree, MA

HVAC Upgrade and Replacement
Post-Bid
Brookline, MA 02445

Pump Station Duct Cleaning and Repairs
Results
$468,000 est. value
Hingham, Quincy, MA 02043

Wellesley Police Station IT Server Rooms HVAC Project
Results
$209,789 est. value
Wellesley, MA 02482

Unit Ventilators
Alteration
Bidding
Canton, MA

Installation of Ductless AC Units
Post-Bid
Less than $40,000 est. value
Westwood, MA 02090

Renovation and Expansion of Existing Locker Rooms at Ulin Rink - Sub-Bids
Results
Less than $475,000 est. value
Milton, MA

Replacement of 10 Unit Ventilators at Galvin Middle School
Alteration
Bidding
Canton, MA 02021

Library Atrium HVAC Renovation and Associated Work
Post-Bid
Wellesley, MA

2020 Pump Station Improvements Project - Filed Sub Bids
Results
$1,250,000 est. value
Weymouth, MA

HVAC Repair and Maintenance Services
Term Contract, Alteration
Bidding
Millis, MA 02054

Rooftop and Make-Up Air Units
Post-Bid
Less than $196,000 est. value
Franklin, MA

Installing A Combination Split Heating and Cooling System
Results
Plainville, MA

Last Updated 07/28/2021 11:52 AM
Project Title

Owner's Project Manager (OPM) for the Norwood Public Safety HVAC Improvements

Physical Address View project details and contacts
City, State (County) Norwood, MA 02062   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Owner’s Project Manager Services shall be associated with the improvements to the Norwood Public Safety Building HVAC. The building was built in 2003. The HVAC system has been problematic since the original installation. A feasibility study has been performed with initial cost estimates. OPM applicants must demonstrate familiarity with HVAC systems, renovation work to existing HVAC systems while the building is occupied, and experience with phased construction.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents