Similar Projects
Last Updated | 04/23/2020 08:55 AM |
Project Title | Seth Grove Stadium Locker Room Addition |
Physical Address | View project details and contacts |
City, State (County) | Shippensburg, PA 17257 (Cumberland County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Stadium |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $800,000 to $1,200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work included under this project at Shippensburg University, Shippensburg Township, Cumberland County, Pennsylvania consists of the construction of a new locker room building at the Seth Grove Stadium with masonry foundation and walls, metal siding, with locker room fit out, including all new HVAC, Plumbing and Electrical, with tie in to the existing building and systems as required including site improvements and utility relocation. The includes construction of a connector with the existing building consisting of a prefabricated noncombustible structure to be placed on concrete foundations and the selective demolition required to provide a new access point including relocation of existing utilities, lighting and door replacement. Contract Cost Ranges: SU-2019/9.1: $ 800,000 - $1, 200,000 (GC) SU-2019/9.2: $ 170,000 - $270,000 (HVAC) SU-2019/9.3: $ 130,000 - $160,000 (Plumb) SU-2019/9.4: $ 110,000 - $140,000 (Elec) |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |