Similar Projects
Econlockhatchee Trail 4-Lane Work - City of Orlando
Infrastructure
Conception
Less than $5,000,000 est. value
Orlando, FL 32801

Taxiway A Extension, Reconfiguration and Rehabilitation
Infrastructure
Bidding
$550,000 est. value
Gainesville, FL 32609

Maintain Airfield Markings
Infrastructure
Bidding
$250,000 to $500,000 est. value
Canaveral As, FL

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Magnetic Variance Change, Change Runway 1/19 Designation to Runway 2/2
Post-Bid
$500,000 to $1,000,000 est. value
Eglin AFB, FL

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

BP S00196, Terminal C, Ph 1X - Airfield Civil, Apron and Taxiway Paving (Project), at Orlando International Airport
Infrastructure
Bidding
$5,367,000 est. value
Orlando, FL 32827

FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field AFB, Florida.
Post-Bid
$25,000,000 to $50,000,000 est. value
Hurlburt Field, FL

Rehabilitation of Runway 14-32
Results
Quincy, FL

Taxiway A Rehabilitation
Post-Bid
$3,200,000 est. value
Zephyrhills, FL 33542

Miami Executive Airport (TMB) Runway Incursion Mitigation (RIM)
Results
Miami, FL 33186

Runway and Taxiway Rehabilitation
Infrastructure
Post-Bid
$2,700,000 est. value
Pahokee, FL 33476

Construction of Hangar Infrastructure Development
Results
Less than $1,000,000 est. value
Umatilla, FL 32784

Runway 9-27 Rehabilitation at Space Coast Regional Airport
Infrastructure
Post-Bid
Less than $4,262,900 est. value
Titusville, FL 32780

Reported 07/07/2022 11:45 AM
Project Title

U.S. Highway 98 Bridge-to-Bridge Multi-Use Path - County of Okaloosa

Physical Address View project details and contacts
City, State (County) Destin, FL 32540   (Okaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value Less than $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Destin, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Construction of a multi-use path on US 98 bridge-to-bridge from West Okaloosa Island to Destin. As of July 6, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents