Similar Projects
General Contracting Projects
Renovation
Bidding
FL

Rolling Hills Subdivision Gravity Sewer, Lift Station and Forcemain
New Construction, Infrastructure
Bidding
Loxahatchee, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Lift Station No. 153
Results
Less than $400,000 est. value
West Palm Beach, FL 33411

Lift Station Rehabilitation Continuing Construction Contract 2020 WUD
Term Contract
Results
Less than $7,200,000 est. value
West Palm Beach, FL 33416

Lift Station No. 20 Replacement
Renovation
Construction
$1,737,000 est. value
Palm Beach Gardens, FL

Improvements to Master Repump Station 9-North WUD
Post-Bid
$3,200,000 est. value
West Palm Beach, FL

Lift Station 53 Improvements
Results
$350,000 to $500,000 est. value
West Palm Beach, FL 33407

Repump Station No. 8310 Upgrades and Improvements
Renovation
Post-Bid
West Palm Beach, FL

Gumbo Limbo Nature Center Seawater Intake Replacement and Pump Station
Results
$3,100,000 est. value
Boca Raton, FL 33432

Improvements to Lift Stations 1043, 1045, and 5209
New Construction
Post-Bid
FL

Woodlands Park Sewer Improvements
Results
Less than $300,000 est. value
Boca Raton, FL 33434

S-6 Pump Station Refurbishment Phase I
Renovation
Post-Bid
$1,058,700 to $1,170,150 est. value
West Palm Beach, FL 33422

PGA Wastewater Treatment Plant Scum Pump Station Replacement
Results
Less than $700,000 est. value
Palm Beach Gardens, FL 33418

Last Updated 11/01/2021 08:48 AM
Project Title

Rehabilitation of Lift Station Nos. 6, 16, and 18

Physical Address View project details and contacts
City, State (County) Lantana, Palm Beach, FL 33462   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of furnishing all labor, materials, equipment, and all incidentals and appurtenances for the demolition of the existing pumps, piping, valves, electrical panel, hatches, and top slabs at Lift Stations No. 6, 16, and 18 and installation of proposed pumps, piping, valves, hatches, top slabs, and electrical improvements at the respective lift station sites.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents