Similar Projects
Nickerson Road/Campground Road - Reclaiming and Paving
Post-Bid
Swanville, ME

Webster Road - Reclaiming
Post-Bid
Swanville, ME

Bituminous Concrete Paving
Results
ME

(LCP) Light Capital Paving
Results
Carmel, Detroit, Etna, Hampden, Newburgh, Newport, Palmyra, Pittsfield, Plymouth, Winterport, ME 04419

Paving
Post-Bid
Frankfort, ME 04438

On Call Maintenance Paving/Located in Regions 1-5
Results

Paving Project
Post-Bid
Prospect, ME

Crack Sealing
Results
Less than $184,000 est. value

Pavement Milling, Ultra-Thin Bonded Wearing Course with Safety Improvements
Results
Less than $2,537,000 est. value
Belfast, Northport, Searsport, ME 04915

Road Work - Paving and Reclaiming
Results
Northport, ME

On Call Milling Machines and Grinders
Results

2020 Paving
Results
Lincolnville, ME

Gravel Road Construction
Results

Paving Project
Results
Searsport, ME 04974

On Call Milling Machines and Grinders
Results

Last Updated 01/29/2020 12:00 PM
Project Title

Bituminous Concrete Paving

Physical Address View project details and contacts
City, State (County) Lincolnville, ME 04849   (Waldo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Youngtown Road – (14,850 feet +/- of length, width to match existing pavement). The paving will overlay previously installed bituminous concrete. The paving is to match the current paved width of the road from the Beach Road (State Route 173) to the Camden Road (State Route 52). After sweeping the road shall be tack coated, at a rate of .02 gallons per square yard, prior to pavement placement. The road shall then be shimmed and compacted to a depth of ½ inch. In addition to the shim course, Youngtown Road will receive an additional course compacted to a 1.5 inch thickness of MDOT 12.5mm Mix. A similar placement of shim and surface will also be applied to the paved section of the Thurlow Road (located approximately mid-way across the Youngtown Road).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents