Last Updated | 03/21/2023 03:27 PM |
Project Title | Renovations to Shakerag Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Johns Creek, GA 30097 (Fulton County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Fulton County Schools (FCS) is seeking a qualified and experienced firm to provide Construction Services for Shakerag Elementary School at 10885 Rogers Circle, Johns Creek, GA 30097. Questions regarding the Request for Proposal process should be directed to Angela R. Young, Fulton County Schools Capital Program Contracts via facsimile at (470) 254-1248 or via e-mail at cpcontractsfultonschools.org. Only questions received by Thursday, March 2, 2023, by 4:00 p.m. (Per FCS Contracting time clock) will be considered. NOTICE OF INTENT TO AWARD (NOI): APRIL 17, 2023 The Fulton County Schools (FCS) is seeking a qualified and experienced firm to provide Construction Services for Shakerag Elementary School at 10885 Rogers Circle, Johns Creek, GA 30097. Questions regarding the Request for Proposal process should be directed to Angela R. Young, Fulton County Schools Capital Program Contracts via facsimile at (470) 254-1248 or via e-mail at cpcontractsfultonschools.org. Only questions received by Thursday, March 2, 2023, by 4:00 p.m. (Per FCS Contracting time clock) will be considered. The Work of Project is the Contractor's responsibility, is defined by the Contract Documents, and consists of the following: BUILDING IMPROVEMENTS - INTERIOR -Replace acoustical tile ceilings in corridors, Media Center, and Cafeteria - Remove existing VCT flooring and replace with new LVT flooring at classrooms and other spaces as indicated in contract documents. - Painting of miscellaneous drywall soffits. HVAC SYSTEM IMPROVEMENTS - Replacement of existing central plant including cooling tower, boilers, heat exchanger, pumps, terminal units, and pressure dependent terminal units. - Replacement of existing water source heat pump (WSHP) units including piping. accessories and bi-polar ionization units. - Replacing roof mounted energy recovery ventilators with energy recovery units providing dehumidification. - Replace existing water heater with multiple instantaneous water heaters - Furnish and install air conditioning in MDF/IDF rooms - Replacement of the energy management system. - Furnish and install kitchen vent hood fans. -Furnish and install duct insulation as indicated in contract documents. - Cleaning of existing ductwork. ELECTRICAL IMPROVEMENTS - Upgrade of electrical distribution system as required for all new HVAC equipment installed. - Replace emergency generator and upgrade generator distribution in accordance with FCS design requirements. - Replace main switchboard. - Replace existing lighting in corridors, Media Center, and Cafeteria with LED lighting. fb LOW VOLTAGE TESTING - Provide inspections of low voltage systems in accordance General Requirements Section 011001 1.3 B. Obligations 0f Contractor |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |