Similar Projects
Ground Power Units
Bidding
Charlotte, NC

Electrical Switchgear Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC

Charles Hayward Memorial Practice Gym Lighting Renovations
Post-Bid
Charlotte, NC

Digital Signage Solution
Results
$200,000 est. value
Charlotte, NC

On-Call Electronic Equipment Repair Services
Results
Charlotte, NC

Theater Lighting Equipment
Post-Bid
Charlotte, NC

APC Smart-Ups SRT 2200VA Or Equivalent UPS Equipment
Results
Charlotte, NC

Electric Line Distribution Installation
Post-Bid
Charlotte, NC

Construction of Fuse Underground
Results
Charlotte, NC

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Electrical Services
Results
Charlotte, NC

Preventative Maintenance and Repair of Small Emergency Generators
Term Contract
Post-Bid
Charlotte, NC 28216

Lighting Upgrade Project in the Rowe Building
Results
Charlotte, NC 28223

Mallard Creek Water Reclamation Facility Reliability and UV Improvements - Electrical Bid Package
Post-Bid
Less than $2,400,000 est. value
Charlotte, NC 28262

Pump and Motor Repair Service
Results
Charlotte, NC

Reported 02/01/2019 12:00 AM
Project Title

Charles Hayward Memorial Practive Gym Lighting Renovations

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description The following are the tasks associated with the Charles Hayward Memorial Practice Gym Lighting Replacement project: 1. Removal of existing HID sports lighting system, including remote ballast enclosures and the 600V wiring from ballast to luminaire. 2. Installation of new University provided LED sports lighting system, including remote driver enclosures and new 1000V wiring from driver to luminaire. 3. Branch circuits, including conduits, conductors, outlets, boxes, receptacles, and fittings. 4. Replacing existing 277/480V, 3-phase, 4-wir panel 'GL' with new panel 'GL 2018'. 5. Power connection to all equipment requiring power. 6. Replacing existing fluorescent wall sconces with new owner furnished LED Luminaires.
Details
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents