Similar Projects
LEC Parking Lot
Infrastructure
Results
Hutchinson, KS

Pedestrian and Bicycle Paths. Washington St Fr n 17th Ave To n 23rd Ave In The City Of Hutchinson In Rn Co. Lgth Is 0.80 Mi.
Infrastructure
Results
KS

Chip Seal - K148 Fr K148/K28 JCT E TO K148/US81 JCT in RP and JW Co. Lgth 22.50 MI.
Infrastructure
Results

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

Residential Street Maintenance
Infrastructure, Alteration
Results
$1,853,644 est. value
Hutchinson, KS

Chip Seal. k-68; Ka 6374-01; Fr k-33/k-68 Jct e 1.027 Mi to Fr/Mi Co Ln in Fr Co. Ka 6375-01; Fr Fr/Mi Co Ln 12.40 Mi e to u-169/k-68 Jct In Mi Co. Length 13.414 Mi.
Infrastructure
Results

Milling and HMA Overlay
Infrastructure
Results

11th Avenue Reconstruction - Harsha Canal to Main Street
Infrastructure
Results
Hutchinson, KS

Farmington Park Improvement
Renovation
Results
Hutchinson, KS 67502

Arterial Street Maintenance
Infrastructure
Results
$730,000 est. value
Hutchinson, KS

Wells Lot 2 and Midwest Malibu Parking Lot Reconstruction
Infrastructure
Results
$200,000 est. value
Partridge, KS

Water Maintenance Parts
Infrastructure
Post-Bid
Hutchinson, KS

CCLIP Resurfacing K61 from US50 to 17th Avenue
Infrastructure
Results
$1,211,209 CJ est. value
Hutchinson, KS 67501

CCLIP Resurfacing K61 from US50 to 17th Avenue
Infrastructure
Results
$1,211,209 CJ est. value
Hutchinson, KS 67501

CCLIP Resurfacing K61 from US50 to 17th Avenue
Infrastructure
Results
$1,211,209 CJ est. value
Hutchinson, KS 67501

Last Updated 08/23/2022 08:36 AM
Project Title

Drainage Improvements at Farmington Park and Lorraine

Physical Address View project details and contacts
City, State (County) Hutchinson, KS 67501   (Reno County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $198,904 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work provides for the furnishing of all materials, equipment and labor for constructing the Drainage Improvements at Farmington Park and Lorraine in the City of Hutchinson, Kansas, and consists of the following estimated quantities for sample units of work; o 5'x8'Reinforced Concrete Box - 102 LF o Curb and Gutter R&R - 114 LF o Unclassified Excavation - 719.8 CY o Embankment - 669.6 CY o Aggregate Base - 61 CY o Removal of Existing Structure - 3 EA Other Work includes Hot Mix Asphalt, Sawcutting, Seeding and Mulching, Erosion Control, and Traffic Control.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents