Similar Projects
Mill, AC Resurfacing - US 212
Infrastructure
Design
$8,162,000 CJ est. value
Faulkton, SD 57438

Mill, AC Resurfacing - US 212
Infrastructure
Design
$8,162,000 CJ est. value
Faulkton, SD 57438

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

AC Resurfacing, Pipe Work
Infrastructure
Post-Bid
$3,592,000 CJ est. value
Faulkton, SD 57438

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Cold Milling, Asphalt Concrete Resurfacing (74K tons), Pipe Work
Infrastructure
Results

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing, Pipe Work
Infrastructure
Post-Bid
$8,672,000 CJ est. value
Faulkton, SD 57438

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing (34K Ton) and Culvert Repairs
Infrastructure
Results

Chip Seal Surface Treatment
Infrastructure
Post-Bid
$300,000 CJ est. value
Faulkton, SD 57438

Bridge Deck Sweeping in the Aberdeen Area
Infrastructure
Results
Aberdeen, SD

Polymer Chip Seal
Infrastructure
Results
$356,522 CJ est. value
Faulkton, SD 57438

Faulkton School Parking Lot Improvements
Infrastructure
Results
$207,004 CJ est. value
Faulkton, SD 57438

Sanitary Sewer Improvements Project
Infrastructure
Results
$295,748 CJ est. value
Seneca, SD 57473

Last Updated 03/14/2023 07:38 AM
Project Title

Mill and AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Faulkton, SD 57438   (Faulk County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $13,842,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD20 - Fm SD45 to Brentford Length 34.8 As of March 14, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill and AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents