Project Title | Price County Airport Runway 1/19 Rehabilitation and Lighting Replacement |
Physical Address | View project details and contacts |
City, State (County) | Phillips, WI 54555 (Price County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Runways/Taxiways |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Runway 1/19 Rehabilitation and Lighting Replacement; NAVAIDs Improvements; Access Road and Parking Lot Improvements; Motorized Gate Replacements; Pavement Maintenance. Estimate of major quantities: Base Bid – Runway 1/19 Rehabilitation: Base Aggregate Dense 1 1/4” 6,000 TON; Pulverize and Relay 50,000 SY; HMA Pavement 11,600 TON; Mulching, Method B (Wood Fiber) 18,500 SY; Painting, White, Waterborne, Type I 14,200 SF; Runway 6/24 Circuit Modifications 1 LS. Alternate Bid #1 – Runway 1/19 Lighting Replacement: 5000 Volt Cable NO.8 17,500 LF; Bare Counterpoise Wire NO.2 10,500 LF; NO.6 AWG, Insulated, Stranded Equipment Bonding Ground 16,500 LF; Non-Encased, HDPE Electrical Conduit, 1-Way 1 ¼ Inch 14,500 LF; Medium Intensity Runway Lights, L-861(L), Base Mounted 50 EA; LED L-858(L) Guidance Sign, 2 Module 3 EA; New Regulator for Runway 1/19 Circuit 1 EA. Alternate Bid #2 – NAVAIDs Improvements: L801A, Class 2, Airport Rotating Beacon with 40 Ft Tip Down Pole 1 LS; REILS Constant Current L-849L, Style A 2 EA; Runway 1/19 PAPI L881, Style B, Class II 2 EA. Alternate Bid #3 – Access Road and Parking Lot Improvements: Excavation Common 2,400 CY; Base Aggregate Dense 1 1/4" 3,400 TON; HMA Pavement 1,600 TON; Concrete Sidewalk 5-Inch 630 SF; Mulching, Method B (Wood Fiber) 3,500 SY; Protective Bollards 12 EA. Alternate Bid #4 – Motorized Gate Replacements: Motorized Vertical Pivot Gate, 16’ Clear Opening 3 EA; Motorized Vertical Pivot Gate, 24’ Clear Opening 1 EA. Alternate Bid #5 – Pavement Maintenance: Painting, Yellow, Waterborne, Type I 3,000 SF; Asphalt Rejuvenation 27,600 SY; Crack Leveling Asphaltic Pavement (Mastic) 11,700 LF; Crack Leveling Asphalt Pavement (Poly-Fiber) 38,200 LF. DBE Goal: 3.05% Contract Completion Time: Base Bid, Alternate Bid #1, Alternate Bid #2, Alternate Bid #5: 60 calendar days Alternate Bid #3: 30 additional calendar days Alternate Bid #4: 30 additional calendar days |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |