Similar Projects
Replace Waterline
Infrastructure
Design
$900,000 est. value
Centralia, IL 62801

30-Inch Transmission Main Rehabilitation
Infrastructure
Bidding
Evanston, IL

Water Main at Mile Long Bridge
Infrastructure
Bidding
IL

Drainage Engineering Services
Term Contract
Post-Bid
IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

2020 Sanitary & Water Structure Rehabilitation
Renovation
Results
Lincolnshire, IL 60069

Vetter Road Segment II Roadway Reconstruction & Realignement Drainage Improvements
Addition
Construction
Joliet, IL

2020 Water Main Improvements
Infrastructure
Bidding
Chicago, IL

FY21 Sanitary and Storm Sewer Closed Circuit Television (CCTV)
Term Contract
Post-Bid
Niles, IL 60714

Main Street Water Extensions
Results
$200,000 est. value
Pecatonica, IL 61063

2021 City Hall Fire Main Project
Infrastructure
Bidding
Batavia, IL 60510

Condition Assessment of Water Distribution System Valves
Term Contract
Post-Bid
Washington, IL

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

Water and Sewer Division Materials and Supplies
Infrastructure
Bidding
Aurora, IL

Reported 10/15/2021 09:46 AM
Project Title

Catch Basin and Valve Vault Repair & Replacement

Physical Address View project details and contacts
City, State (County) Cary, IL   (McHenry County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

These repairs will be classified in two categories: 1. Ring Replacement a. Ring replacement will consist of removal of asphalt and/or curb, replacement of damaged rings, and restoration of site. b. Ring replacement will be in two separate categories i. Replacement of rings up to 3” - Most common ii. Ring replacement of 4” and greater 2. Complete Replacement a. Complete replacement will consist of removal of asphalt and/or curb, removal and replacement of basin and restoration of site. All repairs will be made comparable in size, shape, and style of existing structures and will meet all applicable specifications unless otherwise noted. LOCATIONS The Village has identified three specific locations for repairs to be made as part of the base bid. 1) One (1) structure is located at the intersection of Aberdeen Road and High Road (attachment A). 2) Two (2) structures are located at the intersection of Silver Lake and Three Oaks Road (attachment B). 3) Additional repairs will be identified as needed and based upon the available budget remaining for this project.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents