Similar Projects
Stop N Store - Bloomingdale
New Construction, Infrastructure - 82,000 SF
Conception
$8,000,000 CJ est. value
Bloomingdale, GA 31302

Rough Grading Improvements Bryan County Megasite
Infrastructure
Design
$600,000 CJ est. value
Savannah, GA 31401

SR 26 From I-516 to CS 188 / Ogeechee Road
Infrastructure
Design
$20,000,000 CJ est. value
Bloomingdale, GA 31302

America's Second Harvest of Coastal Georgia
New Construction, Infrastructure - 152,000 SF
Bidding
$500,000 CJ est. value
Savannah, GA 31405

RFQ Construction Manager at Risk - New Physical Plant Savannah State University
New Construction, Infrastructure
Bidding
$4,750,000 CJ est. value
Savannah, GA 31401

Bloomingdale Regional Utilities
New Construction
Post-Bid
Savannah, GA

Test Pit Excavation and Potential Removal of Underground Storage Tank
Infrastructure
Post-Bid
Savannah, GA

Lift Station 23 Upgrades and Force Main Replacement
Renovation, Infrastructure
Results
Savannah, GA

Sallie Mood Drive/Agonic Road Force Main Replacement - Phase II
Infrastructure
Results
$943,250 CJ est. value
Savannah, GA 31406

JC Lewis Ford Dealership
New Construction, Infrastructure
Construction
$12,400,000 CJ est. value
Pooler, GA 31322

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Savannah, GA 31405

Abercorn Street Hotel
New Construction, Infrastructure - 1,990 SF
Pending Verification
$14,000,000 CJ est. value
Savannah, GA 31401

Meinhard Road Retail and Service Station
New Construction, Infrastructure - 8,025 SF
Design
$2,120,000 CJ est. value
Savannah, GA 31407

Red Gate Farms Storm Drainage Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Savannah, GA 31405

Savannah Quarters Lift Station and Force Main
New Construction, Infrastructure
Post-Bid
Pooler, GA

Last Updated 09/15/2022 04:05 PM
Project Title

Maple Street Pump Station Reconstruction

Physical Address View project details and contacts
City, State (County) Bloomingdale, GA 31302   (Chatham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this Contract consists of the reconstruction of an existing pump station, including a new wet well and piping and relocation of the existing pumps, pump controls, and odour control system. Any questions that may arise from this invitation shall be submitted in writing and emailed to Donna no later than September 7, 2022. The City of Bloomingdale reserves the right to reject any and all bids and to waive any informality in the bidding. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin and the Title VI of the Civil Rights Act of 1964.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents