Similar Projects
HVAC, Electrical and Roofing On-Call Single Trade Services
Post-Bid
Denver, CO 80202

IDF Room Cooling
Post-Bid
CO

HVAC Preventative Maintenance and Repair Services
Results
Byers, Centennial, Deer Trail, Denver, Englewood, Sheridan, CO 80112

HVAC System - 2011-124M14, 2011-124M19 Sb267, 2015-117M19
Results
Denver, CO

AHEC-20404-B: Arts Building Ventilation Enhancement
Post-Bid
Denver, CO 80204

A/C Replacement at 1525 Sherman Street Lobby
Results
Denver, CO

Ground Power Units (Jetway Mounted) and PC Air Handlers for Concourse A
Post-Bid
Denver, CO 80202

Repair/Replace Air Handler Unit
Results
Less than $200,000 est. value
Denver, CO

HVAC
Term Contract
Post-Bid
Denver, CO 80223

Concourse A and C Pre-Conditioned Air Re-Life
Results
Denver, CO

J041--OCC-Data Center A/C Repairs Pop: 09-25-2020 To 09-24-2021
Post-Bid
Denver, CO 80209

Air Conditioning Units
Results
Denver, CO 80203

Noel Air Cooled Chiller Design Build
Post-Bid
Denver, CO 80239

Annual HVAC Maintenance
Term Contract
Results
Less than $135,000 est. value
Denver, CO 80230

J041--OCC-Data Center A/C Repairs Pop: 11-20-2020 To 11-19-2021
Post-Bid
Denver, CO

Reported 03/28/2020 12:00 AM
Project Title

SB267 Replace Chiller and Chilled Water Loop – Downtown Capitol Complex

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,100,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. A new chiller, cooling tower, free cooling heat exchanger, and associated chilled water pumps. 2. New secondary chilled water pumps for circulation of the main campus loop to buildings on the system. 3. New free cooling heat exchanger in the State Office Building. 4. New fill for two existing cooling towers. 5. New VFD for cooling tower in the State Services Building. 6. New control valves for all major air handlers in the buildings referenced in Section 1.3.A. 7. All new controls and programming for new and existing components on chilled water system. 8. Removal of abandoned pumps and piping in several buildings. 9. New transformer and electrical gear for powering of new mechanical components. 10. New overhead door in Power Plant. 11. New structural for support of new cooling tower and chiller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents