Similar Projects
Repair Apron Joint Sealant Scott AFB IL
Term Contract
Design
$250,000 to $500,000 est. value
Scott Air Force Base, IL

Rehabilitate and Reprofile Runway 8-26
Infrastructure
Bidding
IL

Realign Taxiway A, Phase 1
Infrastructure
Bidding
IL

Establishment of the NAVAIDS Facilities Serving Extended Runway 9R-27L
Post-Bid
$5,000,000 to $10,000,000 est. value
Chicago, IL 60666

Waterborne Airfield Pavement Marking Paint (WAPMP) And Glass Beads
Term Contract
Post-Bid
IL

Rehabilitate Aircraft Parking Apron Pavements, Phase 2
Results
Bolingbrook, IL 60440

Rehabilitate Taxiway D
Results
IL

Rehabilitate Airport Runways Homerun Ductbank
Infrastructure
Bidding
IL

Jail East Side Pavement Resurfacing
Post-Bid
Aurora, Saint Charles, IL 60505

Rehabilitate Taxiway A and Connectors
Results
IL

Rehabilitate Lighting for Runway 18/36 and Parallel Taxiway
Infrastructure
Bidding
IL

2021 Airfield Remarking Repairs
Alteration
Post-Bid
Wheeling, IL

Rehabilitate Runway 18/36
Results
IL

Install Taxiway Lighting to Replace Reflective Markers
Infrastructure
Bidding
IL

Expand West Apron
Infrastructure
Post-Bid
Peoria, IL 61640

Reported 07/24/2021 12:00 AM
Project Title

QCIA Shorten Runway 5/23 And Realign Taxiway A

Physical Address View project details and contacts
City, State (County) Moline, IL   (Rock Island County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Unclassified Excavation – 46,000 CY, Pavement Removal – 67,000 SY, Recycled Concrete Aggregate Base – 28,000 CY, 15” PCC Pavement – 23,000 SY, 12” RCP, Class IV – 1,150 LF, 18” RCP, Class IV – 900 LF, 24” RCP, Class IV – 300 LF, 4’ Manhole – 9 EA, Inlet – Type A – 4 EA, 6” Perforated Underdrain – 4,800 LF, 12” Sanitary Sewer – 1,720, 4’ Sanitary Manhole – 5 EA, Seeding – 50 Acre, Mulching – 50 Acre, Electrical Cable – 48,000 LF, Edge Lights – 60 Each.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents