Similar Projects
Pedestrian Safety Action Plan - Phase III
Post-Bid
Rochester, NY 14614

Coatings, Tapes, Symbols and Adhesives for Signs and Roads
Term Contract
Post-Bid
Lake George, NY 12845

Overhead Sign Structure and Panel Repair/Replacement
Results
Less than $1,900,000 est. value
NY

Safety Upgrades and Miscellaneous Work from MP 304.5 to MP 313.8
Results

Repair, Installation and Supply of Guide Rail
Term Contract
Post-Bid
Carmel, NY 10512

Hangar Door Hazardous Area Marking
Results
Fort Drum, Syracuse, NY 13211

Glass Beads for Reflectorized Pavement Traffic Markings/2021
Term Contract
Post-Bid
White Plains, NY 10607

Highway Guide Rail Post Driving Serivces
Term Contract
Results
Utica, NY 13501

Reflectorized Glass Spheres
Term Contract
Post-Bid
Ballston Spa, NY 12020

Final Denial Barrier Repair
Results
Rome, NY 13441

Installation of Used-12 Gauge Steel Flex Beam Guardrail
Post-Bid
Auburn, NY

9905--VA Interior Digital Signs and Media Players
Results
Carmel, Goshen, Monticello, Montrose, New City, Pine Plains, Port Jervis, Poughkeepsie, Wappingers Falls, NY 10548

On-Call Flag Pole Repair for Yonkers Public Schools
Term Contract
Post-Bid
Yonkers, NY

Replace or Remove Overhead Signs and Sign Structures at Various Locations
Results
Less than $1,000,000 est. value
German Flatts, Marcy, New Hartford, Utica, NY 13501

Traffic Cones and Barricades
Post-Bid
Rochester, NY

Reported 03/30/2022 12:00 AM
Project Title

Campus Wide Exterior Wayfinding Upgrades

Physical Address View project details and contacts
City, State (County) Cortland, NY 13045   (Cortland County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $753,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For the second phase of exterior signage, to be furnished and installed on their campus before the start of the Fall Semester 2022. Included are 212 signs that require engineering, custom architectural fabrication, and installation in a variety conditions, ranging from soil, new poles, existing poles, and concrete. Installation work will also require concrete flat work, as well as demolition of existing signs. Substantial completion is August 20, 2022.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents