Similar Projects
Power & Ice Building
New Construction
Conception
Little Rock, AR

East Argenta Land Holdings
New Construction
Conception
North Little Rock, AR

ATHC
New Construction - 3,350 SF
Design
$1,000,000 est. value
Little Rock, AR 72204

O'Reilly Senior Community
New Construction - 163,915 SF
Design
$10,000,000 est. value
Maumelle, AR 72113

JP Wright Loop Rd. Rail Grade Separation (S)
Infrastructure
Bidding
$15,000,000 CJ est. value
Jacksonville, AR 72076

JP Wright Loop Rd. Rail Grade Separation (S)
Infrastructure
Bidding
$15,000,000 CJ est. value
Jacksonville, AR 72076

2021 Asphalt Overlay Program
Infrastructure
Post-Bid
Jacksonville, AR

Hemphill Road Improvements
Infrastructure
Post-Bid
Sherwood, AR 72120

2021 Street Resurfacing Program
Results
North Little Rock, AR

Sevier Street - Geyer Springs Road (CONC PVMNT PRES)
Infrastructure
Results

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Taxiway Charlie Reconstruction Program - Phase 2
Infrastructure
Construction
$70,754,110 CJ est. value
Little Rock, AR 72202

Quapaw Subdivision - Master Plan
New Construction
Pending Verification
North Little Rock, AR

The Esplanade District Phase II
New Construction
Pending Verification
North Little Rock, AR

Brock Townhomes
New Construction
Conception
Maumelle, AR 72113

Last Updated 10/03/2022 05:03 PM
Project Title

Hamilton Apartments

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72201   (Pulaski County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $90,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a multi-family apartment development. A more exact scope of work has not been announced including the total square footage of the project. As of October 3, 2022 this project has not been cleared to start construction at this time. Information regarding either an architect or general contractor has not been disclosed. Although there is not a firm timeline, construction is not expected to begin in prior to 2023.

Details

4 Stories Above Grade, Parking Spaces, 432 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents