Similar Projects
Art Center Stair Installation
Alteration
Bidding
Glenwood Springs, CO 81601

Parkview Village Decks Replacement
Alteration
Bidding
Arvada, CO 80002

Re-Plaster and Re-Tile The Bob Burger Recreation Center Lap Pool
Post-Bid
Lafayette, CO

Julesburg Rest Area EIFS Repair and Window Replacement
Post-Bid
Less than $160,000 est. value
Julesburg, CO 80737

Lone Tree Golf Clubhouse Exterior
Results
$150,000 to $200,000 est. value
Lone Tree, CO

Bear Park Phase III - Climate Battery and Dome Functionality
Results
Glenwood Springs, CO 81601

Exterior Restoration and Rehabilitation
Construction
Saguache, CO 81149

Replace Exterior Siding on Indian Peaks Clubhouse
Alteration
Bidding
Lafayette, CO 80026

Rabbit Ears Pass Siding
Post-Bid
Less than $75,000 est. value
CO

Remediate Campus Fall Hazards, Phase 1 and Phase 2
Results
$800,000 est. value
Golden, CO 80401

Buffalo Run Golf Course Club House Stair Railing Replacement
Post-Bid
Commerce City, CO

Cu Den Bldg 1St Replace Main Doors
Results
Denver, CO

Woodman Hall Exterior Egress Stair Replacement Project
Post-Bid
Fountain, CO 80817

Exterior Stair Replacement - Timberline PK-8
Results
Longmont, CO 80504

Paired Panel Operable Wall Partitions
Post-Bid
Glenwood Springs, CO 81601

Last Updated 06/15/2021 01:17 PM
Project Title

Village East Elementary School, Stucco Replacement, Cafeteria Addition and Kitchen

Physical Address View project details and contacts
City, State (County) Aurora, CO 80012   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $5,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the existing stucco system with a thin brick veneer, metal wall panel, and new parapet cap flashing, cafeteria addition, complete kitchen and current cafeteria renovation. The original stucco contains ACM and will be abated by a separate contractor. The abatement will happen over two summers, including summer of 2021 and 2022. In the RFP response, propose the extents of the removal and replacement of the non- ACM containing stucco areas to be replaced each summer. CCSD will evaluate the project approach to determine the feasibility of beginning construction on the cafeteria addition in September. CCSD may opt to begin cafeteria expansion spring break of 2022 and start the kitchen remodel shortly after. All work to be completed by August 5th, 2022.

Details

Division 09 - Finishes, Cement Plastering, Cement Stucco.
Division 11 - Equipment, Unit Kitchens.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents