Similar Projects
Ground Anchor, Roadway Excavation and Timber Lagging
Infrastructure
Bidding
$19,700,000 est. value
CA

Storm Drain System Improvement
Infrastructure
Bidding
$7,946,443 est. value
San Jose, CA 95134

Levee Maintenance Project
Infrastructure
Post-Bid
Stockton, CA 95214

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

CA FTNP YOSE 15(2) Glacier Point Road
Alteration
Bidding
Yosemite National Park, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Post-Bid
$16,200,000 est. value
CA

Compost Leachate Pond Improvements
Renovation
Results
$1,900,000 est. value
Auburn, CA 95603

Fisher Basin Expansion Project
Term Contract
Bidding
$1,450,000 est. value
Morgan Hill, CA 95037

Construct Soldier Pile Wall
Infrastructure
Post-Bid
$1,750,000 est. value
CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

FEMA JFG Koi Pond and Pump
New Construction, Infrastructure
Bidding
$1,751,702 est. value
San Jose, CA 95112

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Last Updated 10/18/2021 05:01 PM
Project Title

Drain Cleaning and Inspection

Physical Address View project details and contacts
City, State (County) Lompoc, CA   (Santa Barbara County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The drainage systems are critical in maintaining the road drainage and stability of the slopes. The drains require cleaning and debris removal every five years to ensure the system integrity is maintained. The drains are currently in need of cleaning. The method for approaching the cleaning and debris removal may vary. For purposes of this PWS, the method in approach combines pressured water and reaming and includes removal of debris and disposal off site. The approach proposed by the Contractor shall be clearly stated in their proposal and must ensure the method minimizes impact to the surrounding area and results in no damage to the drainage system.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents