Similar Projects
The Dairy At Hillcrest
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Hogansville, GA 30230

I-185 From S of SR 1 to I-85
Infrastructure
Design
$4,000,000 CJ est. value
Lagrange, GA 30241

Pavement Patching
Infrastructure
Bidding
$180,000 CJ est. value
Hogansville, GA 30230

Pavement Patching
Infrastructure
Bidding
$180,000 CJ est. value
Hogansville, GA 30230

Authentix Residential Development / LaGrange, GA
New Construction, Infrastructure
Sub-Bidding
$30,000,000 CJ est. value
Lagrange, GA 30241

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Roadway Resurfacing Program
Infrastructure
Post-Bid
West Point, GA

Widening and Reconstruction on US 27/SR 1(Hamilton Road)
Infrastructure
Results
$24,496,534 CJ est. value
Bremen, GA 30110

Widening and Reconstruction on US 27/SR 1(Hamilton Road)
Infrastructure
Results
$24,496,534 CJ est. value
Bremen, GA 30110

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Crossvine Village - Multi-Family and Commercial
New Construction, Infrastructure - 60,000 SF
Construction
$250,000,000 CJ est. value
Lagrange, GA 30241

Daesol Ausys Manufacturing at Northwest Harris Business Park
New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
West Point, GA 31833

Milling and Concrete Rehabilitation on I-85/SR 403
Infrastructure
Bidding
$10,000,000 CJ est. value
West Point, GA 31833

Rosemont Elementary School
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Lagrange, GA 30241

Water System Improvements - Pine Street Elevated Water Tank
New Construction, Infrastructure
Results
$2,054,723 CJ est. value
Hogansville, GA 30230

Last Updated 12/27/2023 10:31 PM
Project Title

Milling, Plant Mix Resurfacing and Single Surface Treatment Paving on Kia Boulevard

Physical Address View project details and contacts
City, State (County) West Point, GA 31833   (Troup County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

6.083 Miles of Milling, Plant Mix Resurfacing and Single Surface Treatment Paving on Kia Boulevard Beginning North of Sandtown Rd and Extending to Warner Rd and on Kia Parkway Beginning North of Sr 18 and Extending South of Kia Boulevard County : Troup District 3 - Thomaston, Area Office 5 - LaGrange All questions and comments must be submitted by the close of business of the Friday two weeks before the letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For those contractors who are currently prequalified as a GDOT Construction Prequalified Contractor or Registered Subcontractor through GDOT's Construction Bidding Administration Office, and want to be prequalified to perform maintenance projects under the Routine Maintenance Services Program, there is now a modified prime contractors application form available. W e welcome you to participate. The application form and all applicable documents, resources and other guidance may be found on the GDOT website. Proposals shall only be submitted electronically as specified in the Specifications; and shall be accompanied by a proposal guaranty in the indicated amount in the form of a Certified Check, Cashiers Check or Bid Bond on the form issued by the Department. This advertisement is merely an invitation for the submission of bids which will be considered as offers for performance of work by the submitting party. The State reserves the right to reject any or all bids. The surety for bid bonds and performance and payment bonds shall be a company acceptable as surety on Federal bonds and listed in the current Federal Register and licensed in the State of Georgia. For any web site-related issues, please contact the following individual: William Dunwoody: 404-631-1147 Should you have questions or need assistance, contact William Dunwoody at 404-631-1147. For amendment related questions or issues regarding projects advertised, please contact the following individual: Tamara Crawford: 404-631-1728 Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. Questions or comments call (404) 631-1147 GADOT - 016 - Milling, Plant Mix Resurfacing and Single Surface Treatment Paving on Kia Boulevard

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents