Similar Projects
Brooke County Recycling Center Restroom Project
Renovation - 600 SF
Post-Bid
Follansbee, WV

Turf Soccer Fields Press Box, Rest Rooms, and Concession Building Project
New Construction
Results
Barboursville, WV 25504

Woman's Club of Charleston - Clubhouse Roof Replacement
Renovation
Post-Bid
Charleston, WV 25311

Phase II Shower Room Improvements Four Seasons Swimming Pool Building
Results
Moundsville, WV 26041

Restroom Renovations
Renovation
Results
Williamson, WV

Coliseum Courtside Club Construction Manager at Risk
New Construction, Term Contract
Post-Bid
Morgantown, WV

Courtside Club - Structural Packages
Renovation
Post-Bid
Morgantown, WV

Cacapon Resort - New Campground
Results
Berkeley Springs, WV 25411

Sacred Heart Community Center
New Construction - 4,500 SF
Results
Wheeling, WV 26003

Level Up Gaming and Coding Center
Renovation - 1,860 SF
Pending Verification
Wheeling, WV 26003

Welcome Center
Infrastructure
Results
WV

Tygart Lake SP Cabin Floor Joist and Sill Plate Repairs
Results
Grafton, WV 26354

Shower and Toilet Renovation-Construction
Renovation
Results
$566,000 est. value
Williamstown, WV 26187

Reported 04/07/2022 10:46 AM
Project Title

ADA Accessible Bathrooms Project

Physical Address View project details and contacts
City, State (County) Martinsburg, WV 25401   (Berkeley County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Restroom/Bath House
Contracting Method
Project Status Permitting, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes demolition of existing bathrooms; demolition of existing shower/storage room; installing two handicapped accessible bathrooms (singularly contained with privacy lock) and installing four individual bathrooms (singularly contained with privacy lock); build storage room; build janitor room; systems update; boiler room update; plumbing update; HVAC update; and electrical updates.

Details

Clubhouse/Social Club, Renovation, Restroom/Bath House, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents