Project Title | Town of Stark Water District No. 1 Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Fort Plain, NY (Montgomery County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work of Contract No. 1-General Construction includes all tools, labor, materials, and equipment necessary to: Construct approximately 4,750 LF of 6" and 8" PVC and HDPE water mains and related appurtenances; construct approximately 490 LF of directional drills at 4 locations; construct approximately 40 HDPE service connections to the ROW/Easement limit; construct new 66,000 gallon glass-lined steel water storage tank and site appurtenances; construct approximately 2,310 LF of 10" HDPE tank connection main and appurtenances; construct source improvements including conversion of three (3) Test Wells into Production Wells; construct approximately 4,500 LF of 2" HDPE raw water mains (partially in common trench) to the treatment building; construct new 360 SF treatment building with process piping, chemical feed equipment, and water system controls; construct related site improvements including access roads; construct treatment building and site electrical and controls systems; construct HVAC system at treatment building; construct plumbing system at treatment building, decommission existing source facilities; and perform miscellaneous site restoration. Contract No. 1 also includes Safe Routes to School (SRTS) sidewalk project work that has been designed by NYSDOT. Contract No. 1 also includes the following alternates: 1) Deductive Alternate No. 1.1 - Change PVC Mains from 8" to 6" 2) Deductive Alternate No. 2.1 - Change Tank Connection Piping from 10" HDPE to 8" HDPE 3) Deductive Alternate No. 3.1 - Substitute Storage Tank 4) Deductive Alternate No. 4.1 - Substitute Controls Equipment |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |