Similar Projects
Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Bidding

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Bidding

2019 Architect/Engineer Construction Management/Inspection Support
Post-Bid
$1,000,000 to $3,000,000 est. value

2019 Architect/Engineer Construction Management/Inspection Support
Post-Bid
$1,000,000 to $3,000,000 est. value

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Design, Engineering, and Construction Services - URD III - Southern Sidewalk Project
Infrastructure
Results
Missoula, MT

City Hall Design
Renovation, Alteration
Bidding
Billings, MT 59101

Engineering, Planning and Development
Post-Bid

Kalispell Upper Zone Wells Project
Alteration
Bidding
Kalispell, MT

2021 Housing Requirements and Market Analysis (HRMA) for Altus AFB, Edwards AFB, Eglin AFB, Royal Air Force Fairford, Malmstrom AFB, Mountain Home AFB, and Osan Air Base
Post-Bid
Altus, OK 73522

Leon Johnson Hall Redundant Heat Pump Module Installation
Renovation, Infrastructure
Bidding
Bozeman, MT 59717

Restoration Community Involvement Services
Term Contract
Post-Bid
Dothan, AL - Phoenix, Tucson, AZ - Channel Islands Beach, Fresno, Moccasin, CA - Des Moines, IA - Ford, Topeka, KS - Louisville, KY - Baltimore, MD - Saint Louis, MO - Biloxi, Gulfport, Kendrick, Meridian, MS - Great Falls, MT - Fargo, ND - Lincoln, NE - Pembroke, Portsmouth, NH - Atlantic City, NJ - Reno, NV - Schenectady, NY - Mansfield, Springfield, OH - Tulsa, OK - Harrisburg, Horsham, Pittsburgh, PA - North Kingstown, RI - Eastover, SC - Alcoa, TN - Richmond, VA - Glen Haven, Milwaukee, WI 03801

Engineering Services - Flathead County Septage Treatment and Biosolids Composting Facility
Term Contract, Alteration
Bidding
MT

General Contract/Construction Manager Services for New Airport Terminal Yellowstone Airport
New Construction, Infrastructure - 38,000 SF
Post-Bid
West Yellowstone, MT

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Reported 10/30/2021 12:00 AM
Project Title

New Wellhouse and Mainline Construction Project

Physical Address View project details and contacts
City, State (County) MT   (Flathead County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Drinking water for the Flathead County Water District #1 – Evergreen is supplied by 11 existing wells completed in the deep artesian aquifer of the Flathead Valley. The oldest of those existing wells, the Shop Well at the District Office site, is reaching the end of its useful life. In anticipation of the eventual termination of use of the Shop Well, the District has recently purchased a tract of land on which two new wells are to be drilled. The new well site is located on the south side of West Reserve Drive just west of the Whitefish River bridge, and immediately downslope of the District’s water storage tank site. The existing 14-inch diameter AC water transmission main that connects the storage tank to the District’s low zone water distribution system runs across the north edge of the new well site. The District has applied for funds from the ARPA program to pay for a portion of the project. The project consists of drilling two new wells, each with an anticipated yield of 750 gpm, constructing a new well house, piping to connect the new wells to the existing transmission main, site improvements including driveway approach, parking, fencing, other security features, connection of the new supply facilities to the District’s existing water supply SCADA system, landscaping, and drainage improvements. The District is seeking an engineering firm for design, permitting, bid and construction services for constructing a new well house and other project improvements. (1 of 5) The anticipated project schedule consists of two distinct designs, bid and construction phases. Phase 1 involves design and construction of the new wells, including obtaining MT DEQ approval to locate and drill two new wells on the new well site tract, preparation of plans, specifications, bid documents, and permitting as necessary, construction services, and coordination with the District’s hydrogeologist/water rights consultant, testpumping the new wells for both water rights purposes, and determining the actual capacity of the new wells as necessary for Phase 2 design. Phase I will be completed in advance of Phase II. Certain Phase I work tasks are part of the services covered by this Request for Proposals. Phase 2 involves design & construction of the new well house and associated site improvements, obtaining MT DEQ approval of project plans, preparation of plans, specifications, bid documents, and permitting as necessary, construction, administration, inspection, and project closeout services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents