Similar Projects
Orange County Southwest Service Area Potable Water Storage and Repump Facility and Avalon Road Master Pump Station
Bidding
Less than $18,954,291 est. value
Winter Garden, FL 34787

Lift Station Maintenance and Repair
Bidding
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Phase I Wastewater Utility Upgrades
Results
Less than $2,703,260 est. value
Freeport, FL

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Bradley Road Booster Pump Station
Construction
Less than $7,884,680 est. value
Jacksonville, FL 32246

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Deep Injection Well Pump Station Utilities and Concrete Containment
Bidding
$1,500,000 est. value
Naples, FL 34117

Cooper Creek Lift Station Relocation
Renovation
Post-Bid
$1,200,000 est. value
University Park, FL 34201

Downtown Doral PS0014 Reconstruction Sanitary Sewage Pump Station
Results
Less than $2,569,209 est. value
Doral, FL 33174

Submersible Pumps and Wastewater Lift Stations
New Construction
Bidding
Cocoa, FL 32922

Lift Station Pumping Service
Post-Bid
Coleman, FL 33521

Pineapple Park Irrigation Pump Replacement
Results
$50,000 to $75,000 est. value
Jensen Beach, FL 34957

Long Avenue Water and Sewer Improvements
New Construction
Bidding
Less than $5,000,000 est. value
FL 32456

Last Updated 10/08/2020 03:29 PM
Project Title

Stock Island Distribution Pump Station

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of demolishing the existing horizontal split case centrifugal pump station and associated structure and equipment, the steel maintenance building and yard piping. The pump station will be replaced with a variable speed "skid mounted" modular type pumps system similar to that of other existing FKAA pump stations. This pumping system, including suction and discharge piping, connection, new metering vault, electrical components and control system elements shall be incorporated into a prefabricated structure designed to meet local hurricane wind and storm surge requirements. A free standing type auxiliary power generator in a self-contained weather proof enclosure, fuel storage tank and automatic transfer switch will be incorporated adjacent to the facility. A prefabricated and pre-engineered, modular operations building with offices, a laboratory, kitchen and restroom will be installed. The pumping and generator systems and operations building will be installed on a concrete slab which will have an elevation above the 100 year floor elevation. The construction will be sequenced such that the existing pumping systems and associated facility components will remain in service until the new pump station is commissioned.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents