Similar Projects
Fox Mill Elementary School Renovation Project
Renovation, Addition - 85,000 SF
Bidding
Herndon, VA 20171

Fuel Station Replacement Project
Renovation
Bidding
$1,000,000 to $2,999,999 est. value
Spotsylvania, VA 22407

Kitchen, Servery, and Cafeteria Flooring Renovations and Reconfiguration at John Adams Elementary School
Renovation
Post-Bid
Alexandria, VA

Construction Manager at Risk for Hardy Elementary School
New Construction - 106,000 SF
Post-Bid
Smithfield, VA

Pod Renovations at James Hurst Elementary School
Results
Portsmouth, VA

George Mason Elementary School
Results
Less than $58,114,000 est. value
Richmond, VA

Marshall Elementary School Renovation and Addition
Renovation, Addition
Construction
$7,497,000 est. value
Manassas, VA

Early Childhood Center (ECC) General Contractor
Construction
Alexandria, VA 22311

Burnley-Moran Elementary Media Center Modernization
Renovation - 4,052 SF
Bidding
$1,250,000 est. value
Charlottesville, VA 22901

Catoctin Elementary School Three Classroom Addition
Addition
Post-Bid
Leesburg, VA 20175

Construction New Matoaca Elementary School
New Construction - 92,802 SF
Results
$30,700,000 est. value
VA 23803

Fredericksburg Christian Elementary School
New Construction - 48,400 SF
Construction
$3,640,000 est. value
Fredericksburg, VA 22408

Security Vestibule Renovations - Sterling Elementary School, Guilford Elementary School and Sully Elementary School
Renovation
Post-Bid
Sterling, VA 20164

General Contractors for On-Demand Construction Services for Spotsylvania County Public Schools
Term Contract
Results
$400,000 to $5,000,000 est. value
Fredericksburg, VA 22407

St. Patrick's Church and School
New Construction - 45,874 SF
Construction
$10,000,000 est. value
Fredericksburg, VA 22407

Last Updated 03/11/2021 12:31 PM
Project Title

Entry Modifications at Sully ES, Sterling ES and Guilford ES

Physical Address View project details and contacts
City, State (County) Sterling, VA 20164   (Loudoun County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The three school renovations have differing scopes of work and may include, but are not limited to: • Main entry frame and door installations and modifications; • Interior vestibule frame and door installations and modifications; • Main office renovations; • Restroom relocations; • Lighting installations and modifications; • Security installations and modifications; • Communications and Data installations; • Lobby area renovations; • Fire Alarm system installations and modifications; • Fire Sprinkler system installations and modifications; • Electrical installations and modifications • Interior Storefront installations and modifications; • Door Hardware installations and modifications; • Security System installation and modification; • Glass and Glazing installations and modifications; • Flooring installations and modifications; • Hazardous Materials Abatement; and • Ceiling installations and modifications.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents