Similar Projects
Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

Goddard School Addition / Macedonia
Addition, Infrastructure - 3,535 SF
Design
$700,000 CJ est. value
Macedonia, OH 44056

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Macedonia Family Recreation Center - Parking Lot Resurfacing
Results
Less than $280,000 est. value
Macedonia, OH

Replacement and/or Repair of Concrete Sidewalks, Curbs/Ramps and Drive Approaches
Infrastructure
Results
$205,582 est. value
Cuyahoga Falls, OH

Bridge Replacement - SR 8-01.75
Demolition, New Construction, Infrastructure
Construction
$157,585,747 CJ est. value
Akron, OH 44304

Bridge Replacement - SR 8-01.75
Demolition, New Construction, Infrastructure
Construction
$157,585,747 CJ est. value
Akron, OH 44304

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$55,000,000 CJ est. value
Akron, OH 44313

Sgt Clean Car Wash / Fairlawn
Demolition, New Construction, Infrastructure - 5,600 SF
Pending Verification
$5,000,000 CJ est. value
Fairlawn, OH 44333

Akron Zoo - State of Ohio
Infrastructure
Conception
Akron, OH 44307

Roadway Minor Rehab - IR 77
Infrastructure
Design
$2,080,000 CJ est. value
Akron, OH 44320

Ravenna Road Resurfacing Part 1
Infrastructure
Post-Bid
$956,257 est. value
Akron, OH

Last Updated 10/11/2023 01:03 PM
Project Title

Blossom Music Center State Appropriations Project - Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Cuyahoga Falls, OH 44223   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Blossom Music Center State Appropriations Project - Parking Lot Improvements The successful bidder shall begin on portions of the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time ending on May 15, 2022. Each bid must contain the full name of the party or parties submitting the bid and all persons interested therein. Each bidder must submit evidence of its experience on projects of similar size and complexity. Bidders must comply with the prevailing wage rates for on-site labor on Public Improvements in Summit County, Ohio as determined by the current Division of Labor and Worker Safety-Wage and Hour of the Ohio Department of Commerce.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents