Similar Projects
Princeton Executive Park Phases II - IV
New Construction - 22,915 SF
Conception
$10,000,000 CJ est. value
West Windsor, NJ

Clinton Avenue Restaurant And Apartment
New Construction
Conception
Trenton, NJ 08609

Chick-fil-A Restaurant
New Construction - 5,180 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lawrenceville, NJ 08648

Element by Westin Hotel at Princeton Executive Park
New Construction - 100,673 SF
Design
$10,000,000 CJ est. value
West Windsor, NJ

The Halal Guys
Build-Out - 2,407 SF
Post-Bid
Lawrenceville, NJ 08648

Gennaro's Italian Restaurant & Tomato Pies
Addition
Post-Bid
Hamilton Township, NJ 08690

New Concession Building at the Mercer County Park Festival Grounds
New Construction - 2,000 SF
Results
West Windsor, NJ 08550

Popeyes Louisiana Kitchen
Build-Out - 2,875 SF
Construction
East Windsor, NJ 08520

Dubai Bar & Grill Patio Addition
Addition
Construction
Trenton, NJ 08638

Starwood Suites Hotel Phase II
New Construction - 61,884 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Hightstown, NJ 08520

Graduate Hotel
New Construction - 103,624 SF
Design
$100,000,000 est. value
Princeton, NJ 08542

Wood Spring Suites
New Construction - 48,616 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Princeton, NJ 08540

McDonald's Drive-Thru Restaurant
New Construction, Demolition - 4,940 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hightstown, NJ 08520

Hyatt Hotel
New Construction - 75,700 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Princeton, NJ 08540

Chipotle Mexican Grill
Build-Out - 2,679 SF
Design
East Windsor, NJ 08520

Last Updated 10/20/2021 07:47 AM
Project Title

Robbinsville Hotel

Physical Address View project details and contacts
City, State (County) Trenton, NJ 08691   (Mercer County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service, Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposed 4-story hotel with restaurant

Details

Hotel/Motel, 4 Stories Above Grade, New Construction, 105 Unit(s), Food/Beverage Service, 2,000 SF New Construction, New Construction, 123 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents