Similar Projects
Shyft Group Manufacturing Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$16,000,000 CJ est. value
Charlotte, MI 48813

City Sidewalk Repair/replacement
Infrastructure
Bidding
$319,000 CJ est. value
Olivet, MI 49076

City Sidewalk Repair/replacement
Infrastructure
Bidding
$319,000 CJ est. value
Olivet, MI 49076

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Williams St. at RxR Crossing Water Main Improvements
Alteration
Post-Bid
$218,200 est. value
Bellevue, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Sealing, Sealcoating and Striping Parking Lots
Infrastructure
Results
Olivet, MI 49076

I-96 EB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$21,331,000 CJ est. value
Dimondale, MI 48821

I-96 WB over Grand River and Billwood Highway Bridge Replacement
Demolition, New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Dimondale, MI 48821

2022 Crush, Shape and HMA Overlay Project
Infrastructure
Post-Bid
$200,000 est. value
Potterville, MI 48876

Install a Pedestrian Hybrid Beacon Signal on Spicerville Highway West of M-50 In the City Of Eaton Rapids
Infrastructure
Results
Eaton Rapids, MI

HMA Resurfacing - Contract D
Infrastructure
Post-Bid
$2,000,000 est. value
Charlotte, MI

E Jefferson And Madison Street Improvements Project
Alteration
Results
$600,000 est. value
Bellevue, MI

Grand Ledge Delta Center Elementary
Addition, Demolition, Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Lansing, MI 48917

Hot Mix Asphalt Cold Milling and Resurfacing and Pavement Markings on M-43
Infrastructure
Results
$536,000 est. value
Grand Ledge, MI 48837

Last Updated 04/26/2023 04:06 PM
Project Title

Operations Center Parking Lot Rehabilitation Phase 2

Physical Address View project details and contacts
City, State (County) Windsor charter Township, MI 48821   (Eaton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,460,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists pavement rehabilitation, curb and sidewalk repairs, drainage structure repairs, subbase drainage improvements, and lighting upgrades within two existing parking lots at the Operations Center within the State of Michigan Secondary Complex, Eaton County, Michigan. The pavement rehabilitation will utilize the crush and shape method for one parking lot and the cold mill and resurface method for the other parking lot. ALL questions should be emailed to Tim Hofferf at THoffert@mbce.com no later than 2:00 p.m., Eastern on 2/22/2023. INDEX NO. 21728 Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or (888) 734-9749.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents