Similar Projects
Drainage Repairs
Bidding
Less than $225,000 est. value

Sidewalk and Drainage Improvements - South Holiday Road
Results
De Funiak Springs, FL

Drainage
Results
Less than $220,000 est. value
FL

Hotz Avenue Outfall Construction
Results
FL

Drainage Repairs
Results
Less than $150,000 est. value

Drainage Outfall Repair
Results
Less than $225,000 est. value
FL

Legion Park Seawall Improvements
Results
Miramar Beach, FL

Kellogg Bayfront Park Seawall Replacement
Results
Less than $305,000 est. value
FL

County Highway 2A Cross Drain Replacement
Results
Less than $950,215 est. value
FL

Drainage
Results
Less than $500,000 est. value

Drainage
Results
Less than $303,910 est. value
FL

Drainage
Results
Less than $1,387,468 est. value
FL

Grading
Results
Less than $569,180 est. value
FL

Seven Runs Creek Streambank Restoration Project
Results
Less than $139,852 est. value
Bruce, FL 32455

Drainage
Results
Less than $335,077 est. value
FL

Last Updated 01/22/2019 04:17 PM
Project Title

Drainage

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Improvements under this Site-Specific Contract consist of removal and replacement of six concrete headwalls/end walls along State Road 20 in Walton County, as well as placing Spiral-Wound Pipe Liner within all associated existing pipes, at designated locations shown in the Appendices. Locations are to be completed in the priority order as listed in the appendix. All work performed under this contract shall be performed in accordance with the attached Plans set. Mobilization, Maintenance of Traffic, Stabilization of Shoulder and Dewatering shall be incidental to the bid items. Alt Item Description Unit Quantity Section 0001 Sodding (Sy) 0104- 10- 3 Sediment Barrier Lf 300.000 0104- 11- Floating Turbidity Barrier Lf 300.000 0110- 1- 1 Clearing & Grubbing Ls 1.000 0400- 2- 2 Concrete Class Ii, Endwalls Cy 115.200 0415- 1- 1 Reinforcing Steel- Roadway Lb 10,370.000 0431- 1- 5 Pipe Liner, Optional Material, 61" And Greater Lf 557.000 0570- 1- 2 Performance Turf, Sod Sy 300.000
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents