Similar Projects
Last Updated | 11/11/2021 11:41 AM |
Project Title | Constructing Pipeline and Pump Station Project |
Physical Address | View project details and contacts |
City, State (County) | Bakersfield, CA 93314 (Kern County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Base Contract (Pipeline and Pump Station): a. Installing ~5.5 Miles of furnished C900 DR 25 PVC Water Main. See Appendix E for complete quantity list and pipe diameter furnished. b. Furnishing and installing ~0.5 Miles of 16-inch C900 DR 25 PVC Pipeline from Well 88-25-031 to Water Main. c. Furnishing and installing Water Main Butterfly Valves, Combination Air Valves, and Blow Off Valves. d. Installing Water Main across the Calloway and CT-1 Canal and the 9-2 Canal. - Demolition of existing canal concrete lining. - Clearing, grubbing, and stripping. - Furnishing and installing rip-rap. - Site grading and earthwork. - Furnishing, installing, maintaining, and removing temporary canal isolation structures. - Dewatering - Construction of canal lining. e. Furnishing and installing two Temporary Discharge Structures From the Water Main to the Friant Kern Canal and Install one Tie-in of the Water Main to an Existing Friant Kern Canal Discharge Structure. f. Furnishing and installing 11 Well Modification, Connections to the Water Main, and Discharge Structures. g. Construction of a 45 cfs pumping plant (4-15 cfs pumps one backup pump), including inlet and outlet structures, CAN pumps, 36-inch pump header pipeline, 30-inch diameter pump inlet pipeline, 18-inch diameter pump outlet pipeline, valves, couplings, meter, 24-inch pressure regulating bypass, pipe supports, pump slab, and entire site grading. h. Construction of concrete electrical equipment slabs. i. Construction of electrical equipment building. j. Furnishing and installing Site Electrical and instrumentation. k. Furnishing an installing chain-link fencing and gates. l. Pumping Plant Site Grading and Earthwork and crushed rock ground cover. The work must be completed during the period identified in the Specifications. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |