Similar Projects
Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Post-Bid
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Better Market Street - Phase 1
Infrastructure
Bidding
$29,500,000 est. value
San Francisco, CA 94158

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

38--Folsom Dam Backup Emergency Pump, Motor and Coupler
Term Contract
Bidding
Folsom, CA

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Treated Water Booster Pumps
Alteration
Results
CA

River Trunk Realignment Shackelford Pump Station
Infrastructure
Bidding
$8,000,670 est. value
Modesto, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Last Updated 11/11/2021 11:41 AM
Project Title

Constructing Pipeline and Pump Station Project

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93314   (Kern County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Base Contract (Pipeline and Pump Station): a. Installing ~5.5 Miles of furnished C900 DR 25 PVC Water Main. See Appendix E for complete quantity list and pipe diameter furnished. b. Furnishing and installing ~0.5 Miles of 16-inch C900 DR 25 PVC Pipeline from Well 88-25-031 to Water Main. c. Furnishing and installing Water Main Butterfly Valves, Combination Air Valves, and Blow Off Valves. d. Installing Water Main across the Calloway and CT-1 Canal and the 9-2 Canal. - Demolition of existing canal concrete lining. - Clearing, grubbing, and stripping. - Furnishing and installing rip-rap. - Site grading and earthwork. - Furnishing, installing, maintaining, and removing temporary canal isolation structures. - Dewatering - Construction of canal lining. e. Furnishing and installing two Temporary Discharge Structures From the Water Main to the Friant Kern Canal and Install one Tie-in of the Water Main to an Existing Friant Kern Canal Discharge Structure. f. Furnishing and installing 11 Well Modification, Connections to the Water Main, and Discharge Structures. g. Construction of a 45 cfs pumping plant (4-15 cfs pumps one backup pump), including inlet and outlet structures, CAN pumps, 36-inch pump header pipeline, 30-inch diameter pump inlet pipeline, 18-inch diameter pump outlet pipeline, valves, couplings, meter, 24-inch pressure regulating bypass, pipe supports, pump slab, and entire site grading. h. Construction of concrete electrical equipment slabs. i. Construction of electrical equipment building. j. Furnishing and installing Site Electrical and instrumentation. k. Furnishing an installing chain-link fencing and gates. l. Pumping Plant Site Grading and Earthwork and crushed rock ground cover. The work must be completed during the period identified in the Specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents