Similar Projects
Windler Master Planned Community
New Construction - 1,900,000 SF
Conception
Aurora, CO

The Enclave At Saddle Rock Golf North
New Construction - 180,000 SF
Conception
$10,000,000 CJ est. value
Aurora, CO 80040

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

RFP Contractor - Thornton Police Department Shooting Range
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Thornton, CO 80229

RFP Engineering - Elm Drive Drainage and Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Commerce City, CO 80022

Parterre
New Construction
Post-Bid
Thornton, CO 80602

Quebec Highlands Infrastructure
Infrastructure
Post-Bid
Thornton, CO 80602

Village of Greenbriar Apartment Improvements
New Construction
Results
Westminster, CO

Reunion Village 8 Filing 1 District Improvements
Infrastructure
Results
Commerce City, CO

Fitness Center - Site Improvements
Infrastructure
Construction
Commerce City, CO 80022

Riverdale Ridge High School CTE/STEM Center
New Construction, Infrastructure - 47,500 SF
Construction
$22,500,000 CJ est. value
Thornton, CO 80602

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Anderson Ranch Residential Development
New Construction
Pending Verification
Commerce City, CO 80022

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Last Updated 02/07/2023 02:11 PM
Project Title

Parterre - Phase 1 - Future Sections

Physical Address View project details and contacts
City, State (County) Thornton, CO 80229   (Adams County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 consists of the construction of 1,501 homes on the northern section of the site. Future Sections of Phase 1 will include 716 homes. As of February 2023, a subdivision plat is awaiting signatures and the the lots have not been recorded by the City of Thornton for the additional sections of Phase 1. Two homebuilders have been selected. Information regarding subcontractor bidding opportunities has not been released. A timeline for construction has not been determined. *Parterre is a 800-acre mixed-use community with 4,100 homes along with retail and parking garage space.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents